Buckinghamshire · England

Building regulations for two-storey extensions in Buckinghamshire

Planning an extension in Buckinghamshire? This is how our building regulations service works, with the England rules and typical fees.

Buckinghamshire at a glance

Nation
England
Price region
South East England
Postcode areas
HP, MK, SL
Towns covered
13 listed below, plus surrounding villages
Site visits
Free, no obligation

What a building regulations application involves

Building regulations approval for a two-storey extension involves preparing technical drawings and a specification that show how the extension meets the rules on structure, fire safety, insulation, ventilation, electrics and drainage, getting them approved and having the work inspected. At the end you receive a completion certificate.

The main places we list in Buckinghamshire are Milton Keynes (MK5), High Wycombe (HP11), Aylesbury (HP17), Bletchley (MK1), Amersham (HP7) and Chesham (HP5). We cover the villages in between too.

Fees

Technical drawings and specification are a guide of £1,500–£4,000. The council's building control fee depends on the value of the work; we confirm every fee in writing before the design stage starts.

Rules in England

In England, building regulations approval comes from council building control or a registered building control approver, using the Approved Documents. Full plans are recommended for two-storey work. New editions of Approved Documents L and F take effect generally from 24 March 2027 and are not yet in force, so current projects follow the 2021 standards.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.

Getting the design right

Dutyholders in England

Since October 2023, where more than one contractor is involved, a principal designer and principal contractor must be appointed. For domestic clients these duties normally pass to the contractor and designer, so on our projects we take them on.

Fire escape from the first floor

In England, first-floor habitable rooms need an escape window, with a clear opening of at least 0.33 m², at least 450 mm wide and high and its bottom no more than 1,100 mm above the floor, or a protected stair. Adding a storey above 4.5 m means a protected stairway or an alternative.

How we work in Buckinghamshire

  1. Measure and listen

    A visit to Buckinghamshire to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.

  2. Choose the approval route

    Some designs fit permitted development, most need a householder application. We decide which applies in England before drawing in detail.

  3. Fixed price in writing

    With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.

  4. Build and sign-off

    Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.

Towns we cover in Buckinghamshire

Building regulations for two-storey extensions in Buckinghamshire: questions

Are the new 2027 building regulations going to affect my extension?

New editions of Approved Documents L and F take effect generally from 24 March 2027 in England, and are not in force yet. Projects approved under the current rules follow the 2021 standards. If your build will start after that date, we check whether transitional arrangements apply.

What is a build-over agreement?

A build-over agreement is permission from your water company to build over or near a public sewer. Many rear extensions sit near shared drains, and the water company will want access protected and the pipe checked. We check sewer records early so the agreement does not delay the start.

Do I need building regulations if I have planning permission?

Yes. Planning permission and building regulations are separate. Planning covers what the extension looks like and how it affects neighbours; building regulations cover how it is built and whether it is safe, warm and healthy. A two-storey extension needs both, unless permitted development replaces the planning part.

Neighbouring areas

All extension services in Buckinghamshire · About building regulations for two-storey extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price