How it works

Seven stages from first visit to completion certificate, with one project lead throughout.

Two-storey rear extension under construction with scaffolding and roof timbers

The stages

1. Free site visit

We visit your home (by arrangement on islands and remote addresses), look at the structure, boundaries, access, trees and drains, and talk through what the new rooms need to do. You get an honest view of what's realistic and the approval route.

2. Design stage, priced in writing

Before any design work starts we send a written price for it. Then we carry out a measured survey and draw the options until you're happy with the layout and the look.

3. Planning or permitted development

If the design fits permitted development we can apply for a lawful development certificate (in Scotland and Northern Ireland, a certificate of lawfulness). If not, we submit a householder planning application and deal with the council's questions.

4. Technical design

A structural engineer designs the foundations, beams and connections. We prepare building regulations drawings (a building warrant in Scotland), check fire escape routes, insulation and ventilation, and serve party wall notices in England and Wales where needed.

5. Fixed build price and programme

With approved drawings and calculations, we give you a fixed build price in writing and a programme you can plan your life around.

6. Build

Groundworks, walls, first floor, roof, windows, then first fix, plastering and second fix. We break through into the house as late as possible. Building control inspects at key stages.

7. Completion

We arrange the completion certificate and hand over warranties for products and certificates for electrical work.

Typical timeline

StageTypical time
Survey, design and planning drawings4 to 8 weeks
Planning decision8 weeks from validation in England and Wales; 2 months in Scotland; often longer in Northern Ireland
Technical design, engineering and approvals4 to 8 weeks (can overlap planning)
Party wall notices (England and Wales)1 to 2 months' notice
Build14 to 20 weeks; 16 to 24 for large or complex designs
Whole projectRoughly 9 to 12 months

Who does what

You deal with one project lead throughout. Behind them: our designers, an independent structural engineer, the council's building control or building standards team (or, in England and Wales, a registered building control approver), a party wall surveyor where the Act applies, and vetted trade teams working under S&K. Under the Building Safety Act rules in England, we take on the principal designer and principal contractor duties for the project where that's agreed in writing.