Building regulations for two-storey extensions in East Riding of Yorkshire
Looking for help with building regulations approval in East Riding of Yorkshire? Here's what's involved, the rules in England and what it typically costs.
East Riding of Yorkshire at a glance
- Nation
- England
- Price region
- Yorkshire and the Humber
- Postcode areas
- DN, HU, YO
- Towns covered
- 8 listed below, plus surrounding villages
- Site visits
- Free, no obligation
What a building regulations application involves
This service suits every two-storey extension, because each one needs building regulations approval wherever you live in the UK. You get technical drawings and a specification coordinated with the structural engineer, a full plans application, site inspections arranged at each stage, and the completion certificate you will need when you sell. We manage the process, and the work is carried out by vetted teams working under S&K.
East Riding of Yorkshire towns we list: Hull (HU1), Bridlington (YO15), Beverley (HU17), Goole (DN14), Brough (HU14) and Driffield (YO25). Every other address in East Riding of Yorkshire is covered as well.
Fees
Technical drawings and specification are a guide of £1,500–£4,000. The council's building control fee depends on the value of the work; we confirm every fee in writing before the design stage starts.
Rules in England
In England, building regulations approval comes from council building control or a registered building control approver, using the Approved Documents. Full plans are recommended for two-storey work. New editions of Approved Documents L and F take effect generally from 24 March 2027 and are not yet in force, so current projects follow the 2021 standards.
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.
Getting the design right
Dutyholders in England
Since October 2023, where more than one contractor is involved, a principal designer and principal contractor must be appointed. For domestic clients these duties normally pass to the contractor and designer, so on our projects we take them on.
Fire escape from the first floor
In England, first-floor habitable rooms need an escape window, with a clear opening of at least 0.33 m², at least 450 mm wide and high and its bottom no more than 1,100 mm above the floor, or a protected stair. Adding a storey above 4.5 m means a protected stairway or an alternative.
How we work in East Riding of Yorkshire
Free site visit
We visit your home in East Riding of Yorkshire, look at the structure, access and boundaries, and talk through what you want the new rooms to do.
Plans, then approval
Measured survey, design, then the right approval route for your house. We explain each step before we take it.
Detail and price
Construction drawings, engineer's calculations and building control sign-off, then a written fixed price for the build.
Build and sign-off
Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.
Towns we cover in East Riding of Yorkshire
Building regulations for two-storey extensions in East Riding of Yorkshire: questions
Are the new 2027 building regulations going to affect my extension?
New editions of Approved Documents L and F take effect generally from 24 March 2027 in England, and are not in force yet. Projects approved under the current rules follow the 2021 standards. If your build will start after that date, we check whether transitional arrangements apply.
What is a build-over agreement?
A build-over agreement is permission from your water company to build over or near a public sewer. Many rear extensions sit near shared drains, and the water company will want access protected and the pipe checked. We check sewer records early so the agreement does not delay the start.
Do I need building regulations if I have planning permission?
Yes. Planning permission and building regulations are separate. Planning covers what the extension looks like and how it affects neighbours; building regulations cover how it is built and whether it is safe, warm and healthy. A two-storey extension needs both, unless permitted development replaces the planning part.
Neighbouring areas
- Building regulations for two-storey extensions in North Yorkshire
- Building regulations for two-storey extensions in South Yorkshire
- Building regulations for two-storey extensions in Lincolnshire
- Building regulations for two-storey extensions in West Yorkshire
All extension services in East Riding of Yorkshire · About building regulations for two-storey extensions
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.