Powys · Wales

Building regulations for two-storey extensions in Powys

We handle building regulations approval for homeowners across Powys, from the first visit to the final paperwork.

Powys at a glance

Nation
Wales
Price region
Wales
Postcode areas
LD, NP, SY
Towns covered
8 listed below, plus surrounding villages
Site visits
Free, no obligation

What a building regulations application involves

Building regulations approval for a two-storey extension involves preparing technical drawings and a specification that show how the extension meets the rules on structure, fire safety, insulation, ventilation, electrics and drainage, getting them approved and having the work inspected. At the end you receive a completion certificate.

The main places we list in Powys are Newtown (SY16), Brecon (LD3), Welshpool (SY15), Llandrindod Wells (LD1), Knighton (LD7) and Llanidloes (SY17). We cover the villages in between too.

Fees

Technical drawings and specification are a guide of £1,500–£4,000. The council's building control fee depends on the value of the work; we confirm every fee in writing before the design stage starts.

Rules in Wales

In Wales, building regulations approval follows the Welsh Approved Documents, which differ from England's in places, notably Part L for energy efficiency. Approval comes from the council's building control service or a registered approver. The structure, fire, ventilation and drainage checks are broadly similar, with a completion certificate at the end.

Approval in Wales: Householder planning application: £585. Councils normally decide householder applications within 8 weeks.

Building regulations: Building regulations approval under the Welsh Approved Documents, which differ from England's in places (notably energy efficiency).

The Party Wall etc. Act 1996 applies in Wales, so notices may be needed for work on or near a shared wall or boundary.

Getting the design right

Full plans and inspections

Full plans approval checks the design before work starts, which we recommend for two-storey extensions. Building control then inspects key stages, such as foundations, damp-proofing, drainage and insulation, before issuing the completion certificate.

How we work in Powys

  1. Measure and listen

    A visit to Powys to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.

  2. Plans, then approval

    Measured survey, design, then the right approval route for your house. We explain each step before we take it.

  3. Structure and building control

    A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Towns we cover in Powys

Building regulations for two-storey extensions in Powys: questions

Do I need building regulations if I have planning permission?

Yes. Planning permission and building regulations are separate. Planning covers what the extension looks like and how it affects neighbours; building regulations cover how it is built and whether it is safe, warm and healthy. A two-storey extension needs both, unless permitted development replaces the planning part.

What is a build-over agreement?

A build-over agreement is permission from your water company to build over or near a public sewer. Many rear extensions sit near shared drains, and the water company will want access protected and the pipe checked. We check sewer records early so the agreement does not delay the start.

Neighbouring areas

All extension services in Powys · About building regulations for two-storey extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price