Design and build two-storey extensions in Aberdeen and Aberdeenshire
Our design and build service covers the whole of Aberdeen and Aberdeenshire. Choose your town below, or get in touch to talk your project through.
Aberdeen and Aberdeenshire at a glance
- Nation
- Scotland
- Price region
- Scotland
- Postcode areas
- AB, DD
- Towns covered
- 13 listed below, plus surrounding villages
- Site visits
- Free, no obligation
What a design and build project involves
A design and build project for a two-storey extension involves one team taking responsibility for the whole job: the survey, design, planning or permitted development, structural engineering, building standards, party wall matters where they apply and the construction itself. You deal with one point of contact instead of coordinating an architect, engineer and builder separately. The design stage is priced first, then the build at a fixed price.
Towns in Aberdeen and Aberdeenshire include Aberdeen (AB10), Peterhead (AB42), Nigg (AB12), Inverurie (AB51), Fraserburgh (AB43) and Westhill (Aberdeen and Aberdeenshire) (AB13). If yours isn't listed, we still cover it.
Fees
The design stage is priced in writing before it starts, and the build is a fixed price in writing once the design is agreed.
Rules in Scotland
In Scotland, design and build covers the Class 1B check or a householder application (£371), the building warrant from the council's building standards service before work starts, and the completion certificate at the end. There is no Party Wall Act, so we handle neighbour matters under common law and title deeds.
Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.
Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.
There is no Party Wall Act in Scotland. Shared walls and boundaries are governed by title deeds and common law, so we speak to neighbours early and record the condition of shared structures.
Getting the design right
How the stages work
We start with a free site visit, then a design stage priced in writing before it begins. That covers the survey, design, approvals, structural design and building standards. Once the design is agreed, the build price is fixed in writing before work starts.
Cost checking as you design
Because the people drawing the extension also build it, each design option comes with a guide cost. That avoids the common problem of an approved design that turns out to be too expensive once builders price it.
How we work in Aberdeen and Aberdeenshire
Start at your house
We come to your home in Aberdeen and Aberdeenshire, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Get it approved
Once you're happy with the design we submit it to the council for Aberdeen and Aberdeenshire and deal with any questions from the planning officer.
Engineer it
Foundations sized for two floors, steels for any openings, and a building warrant, all before anyone starts on site.
Build and hand over
We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.
Towns we cover in Aberdeen and Aberdeenshire
- Aberdeen
- Peterhead
- Nigg
- Inverurie
- Fraserburgh
- Westhill (Aberdeen and Aberdeenshire)
- Montrose
- Stonehaven
- Ellon
- Portlethen
- Banchory
- Cove
- Dyce
Design and build two-storey extensions in Aberdeen and Aberdeenshire: questions
Do I have to use you for the build if I pay for the design stage?
No. The design stage is priced separately, so you can take the approved drawings to other builders if you choose. Most people who use design and build carry on to the build, because the design has been costed as it developed.
When is the build price fixed?
Once the design is agreed and the drawings, structural calculations and specification are complete. Before that we give guide costs at each stage. The fixed price is set out in writing before work starts, and any changes you ask for after that are priced separately before they are made.
What is the difference between design and build and using an architect?
With an architect, you appoint them for the design and approvals, then find and manage a builder separately. With design and build, one team does both, so cost, buildability and approvals are considered together and there is one point of contact. Some people still prefer to hire an architect separately.
Neighbouring areas
- Design and build two-storey extensions in Dundee and Angus
- Design and build two-storey extensions in Perth and Kinross
- Design and build two-storey extensions in the Highlands, Moray and Islands
- Design and build two-storey extensions in Fife
All extension services in Aberdeen and Aberdeenshire · About design and build two-storey extensions
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.