Design and build two-storey extensions in Cornwall

Looking for help with a design and build project in Cornwall? Here's what's involved, the rules in England and what it typically costs.

Cornwall at a glance

Nation
England
Price region
South West England
Postcode areas
PL, TR
Towns covered
10 listed below, plus surrounding villages
Site visits
Free, no obligation

What a design and build project involves

A design and build project for a two-storey extension involves one team taking responsibility for the whole job: the survey, design, planning or permitted development, structural engineering, building regulations, party wall matters where they apply and the construction itself. You deal with one point of contact instead of coordinating an architect, engineer and builder separately. The design stage is priced first, then the build at a fixed price.

Towns in Cornwall include Redruth (TR5), Falmouth (TR10), St Austell (PL23), Truro (TR1), Camborne (TR14) and Newquay (PL28). If yours isn't listed, we still cover it.

Fees

The design stage is priced in writing before it starts, and the build is a fixed price in writing once the design is agreed.

Rules in England

In England, design and build covers the permitted development check or planning application (£548 (or £575 for applications made from 8 December 2026)), building regulations approval from council building control or a registered approver, Party Wall Act notices where needed, and the Building Safety Act dutyholder roles. We programme them so they overlap where possible.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.

Getting the design right

Responsibility for the rules

In England, where more than one contractor is involved, a principal designer and principal contractor must be appointed. On design and build projects we take on these duties, so you are not left holding responsibilities you may not know you had.

Cost checking as you design

Because the people drawing the extension also build it, each design option comes with a guide cost. That avoids the common problem of an approved design that turns out to be too expensive once builders price it.

How we work in Cornwall

  1. Start at your house

    We come to your home in Cornwall, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.

  2. Drawings, then consent

    We draw the scheme, check it against the rules in England, and take it through the right consent with the council.

  3. Structure and building control

    A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.

  4. Build and sign-off

    Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.

Towns we cover in Cornwall

Design and build two-storey extensions in Cornwall: questions

When is the build price fixed?

Once the design is agreed and the drawings, structural calculations and specification are complete. Before that we give guide costs at each stage. The fixed price is set out in writing before work starts, and any changes you ask for after that are priced separately before they are made.

What is the difference between design and build and using an architect?

With an architect, you appoint them for the design and approvals, then find and manage a builder separately. With design and build, one team does both, so cost, buildability and approvals are considered together and there is one point of contact. Some people still prefer to hire an architect separately.

Do I have to use you for the build if I pay for the design stage?

No. The design stage is priced separately, so you can take the approved drawings to other builders if you choose. Most people who use design and build carry on to the build, because the design has been costed as it developed.

Neighbouring areas

All extension services in Cornwall · About design and build two-storey extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.