Greenisland · County Antrim

Extensions over a garage in Greenisland

We cover Greenisland and the rest of County Antrim for extensions over a garage. Start with a free site visit and a plain-English view of what your house and plot can take.

Before you start in Greenisland, here's what applies.

Postcode districts
BT37
County / area
County Antrim, Northern Ireland
Price region
Northern Ireland
Guide price
£27,500–£40,500 (£1,540–£2,240 per m²)
Approval route
Planning permission is needed: permitted development side extensions in Northern Ireland can't be more than 4 m high, which rules out two storeys.
Nearest towns
Jordanstown (1.6 miles), Carrickfergus (2.9 miles), Newtownabbey (3.1 miles)
Distance to Belfast
about 7.5 miles
First visit
Free, no obligation

About an extension over a garage

An extension over a garage is a new first-floor room built on top of an existing attached garage, usually a bedroom, en-suite or study. It uses a footprint you already have, so it adds floor space without taking any garden. The garage walls and foundations often need strengthening or replacing to carry the new floor.

Around Greenisland we also work in Jordanstown, Carrickfergus and Newtownabbey, and across the rest of County Antrim. Postcode district in and near Greenisland: BT37.

What it costs in Greenisland

Guide prices for extensions over a garage in Northern Ireland are around £1,540–£2,240 per m² of new floor space, including VAT. For a typical project with 3 m × 6 m of new first-floor space (18 m²), that's roughly £27,500–£40,500. These are guides, not quotes. Ground conditions, steelwork and access can move the figure either way.

SpecPer m²3 m × 6 m of new first-floor space (18 m²)
Essential£1,420–£2,060 per m²£25,500–£37,000
Standard£1,540–£2,240 per m²£27,500–£40,500
Premium£1,850–£2,690 per m²£33,500–£48,500

Planning and building control in Greenisland

In Northern Ireland, permitted development for two-storey work is set out for rear extensions, so building over a side garage normally needs a planning application, which costs £347 per dwelling. Councils aim for an average of 15 weeks for local applications. Building control approval is also needed, including fire separation if the garage stays in use.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Greenisland homes

Checking the garage foundations

Garages are often built on shallow strip footings sized for a single-storey wall and a light roof. A trial hole shows their depth and condition, and the engineer decides whether they can carry two storeys or need underpinning or new foundations inside the garage.

Fire separation

If the garage stays a garage, the floor between it and the room above, and any door into the house, must give fire separation under building regulations. That usually means fire-resisting plasterboard ceilings, sealed gaps and a fire door, which we design in from the start.

How we'd run your project

  1. Start at your house

    We come to your home in Greenisland, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.

  2. Plans, then approval

    Measured survey, design, then the right approval route for your house. We explain each step before we take it.

  3. Fixed price in writing

    With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Questions about extensions over a garage in Greenisland

How much does an extension over a garage cost in Greenisland?

Our guide for Northern Ireland, which covers Greenisland, is £1,540–£2,240 per m² including VAT. A typical project with 3 m × 6 m of new first-floor space (18 m²) comes to about £27,500–£40,500. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.

Who handles building control for a project in Greenisland?

We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Which postcodes do you cover around Greenisland?

We cover Greenisland (BT37) and nearby places including Jordanstown, Carrickfergus and Newtownabbey, plus the rest of County Antrim. The first site visit is free.

Do I need to convert the garage as well?

No. You can keep the garage for parking or storage and build only the room above, as long as the floor between them and any door into the house meet fire separation rules. Converting the garage at the same time is often good value, because the walls and foundations may be upgraded anyway.

How do I get into a room over the garage?

Usually through a new opening off the existing landing or a bedroom, so the stairs stay where they are. If the floor levels do not match, a step or two may be needed inside the new room. Where a landing opening is not practical, a new stair from a converted garage is an option.

Nearby

Close to Greenisland? We work across the area, including:

Other extensions in Greenisland

All two-storey extension services in Greenisland · Extensions over a garage across County Antrim

Want a figure first? Try our guide price tool, then book a free visit to firm it up.

CallGuide price