Extensions over a garage in Stratford-upon-Avon
We plan and build extensions over a garage for homeowners in Stratford-upon-Avon and nearby. Every project starts with a free visit and a design stage priced in writing before any work begins.
The basics for Stratford-upon-Avon at a glance.
- Postcode districts
- B49, B50, CV36 and CV37
- County / area
- Warwickshire, England
- Price region
- West Midlands
- Guide price
- £31,500–£46,000 (£1,750–£2,550 per m²)
- Approval route
- Planning permission is needed: in England, permitted development only allows single-storey extensions to the side.
- Nearest towns
- Warwick (8.2 miles), Leamington Spa (10.2 miles), Kenilworth (12.1 miles)
- Distance to Nuneaton
- about 25.1 miles
- First visit
- Free, no obligation
About an extension over a garage
An extension over a garage is a new first-floor room built on top of an existing attached garage, usually a bedroom, en-suite or study. It uses a footprint you already have, so it adds floor space without taking any garden. The garage walls and foundations often need strengthening or replacing to carry the new floor.
Around Stratford-upon-Avon we also work in Warwick, Leamington Spa and Kenilworth, and across the rest of Warwickshire. Postcode districts in and near Stratford-upon-Avon: B49, B50, CV36 and CV37.
What it costs in Stratford-upon-Avon
Guide prices for extensions over a garage in the West Midlands are around £1,750–£2,550 per m² of new floor space, including VAT. For a typical project with 3 m × 6 m of new first-floor space (18 m²), that's roughly £31,500–£46,000. Design fees, structural calculations and approval fees are separate and listed on our prices page.
| Spec | Per m² | 3 m × 6 m of new first-floor space (18 m²) |
|---|---|---|
| Essential | £1,610–£2,350 per m² | £29,000–£42,000 |
| Standard | £1,750–£2,550 per m² | £31,500–£46,000 |
| Premium | £2,100–£3,060 per m² | £38,000–£55,000 |
Planning and building regulations in Stratford-upon-Avon
In England, most garages sit beside the house, so building over one makes a two-storey extension beyond a side wall, which always needs planning permission. If the garage is at the rear, the 3 m and 7 m rules for two-storey rear extensions apply, measured from the original house. A householder application costs £548 (or £575 for applications made from 8 December 2026).
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
Design points for Stratford-upon-Avon homes
Matching the house
A room over a garage usually sits beside the front of the house in full view, so roof form, ridge height, windows and brick matter. Setting the front wall and ridge back slightly from the main house usually helps it look as if it belongs.
Fire separation
If the garage stays a garage, the floor between it and the room above, and any door into the house, must give fire separation under building regulations. That usually means fire-resisting plasterboard ceilings, sealed gaps and a fire door, which we design in from the start.
How we'd run your project
Measure and listen
A visit to Stratford-upon-Avon to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.
Design and approvals
We draw the extension and check it against the rules for England, then apply for planning permission or a certificate of lawfulness, whichever fits.
Engineer it
Foundations sized for two floors, steels for any openings, and building control approval, all before anyone starts on site.
On site
One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.
Questions about extensions over a garage in Stratford-upon-Avon
Who handles building regulations for a project in Stratford-upon-Avon?
We handle it as part of the project. What's needed in England: building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Which postcodes do you cover around Stratford-upon-Avon?
We cover Stratford-upon-Avon (B49, B50, CV36 and CV37) and nearby places including Warwick, Leamington Spa and Kenilworth, plus the rest of Warwickshire. The first site visit is free.
How long does an extension over a garage take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Can my garage take a room on top?
Sometimes, but it needs checking. Many garages are built on shallow footings with thin walls, designed only for a single storey. We dig a trial hole and inspect the walls, and the structural engineer decides whether to reuse them, strengthen them, underpin the footings or build new foundations inside the garage.
Do I need to convert the garage as well?
No. You can keep the garage for parking or storage and build only the room above, as long as the floor between them and any door into the house meet fire separation rules. Converting the garage at the same time is often good value, because the walls and foundations may be upgraded anyway.
Nearby
The same service in neighbouring towns:
Other extensions in Stratford-upon-Avon
- Rear
- Side
- Wraparound
- Part two-storey
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Stratford-upon-Avon · Extensions over a garage across Warwickshire
Want a figure first? Try our guide price tool, then book a free visit to firm it up.