Armagh · County Armagh

Extra bedroom and en-suite extensions in Armagh

Thinking about an extra bedroom and en-suite extension in Armagh? We design it, take it through the approvals it needs and build it, with one team responsible from the first visit to the final certificate.

Before you start in Armagh, here's what applies.

Postcode districts
BT61
County / area
County Armagh, Northern Ireland
Price region
Northern Ireland
Guide price
£49,500–£66,500 (£1,760–£2,380 per m²), plus £5,500–£11,000 for the en-suite
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Nearest towns
Keady (7 miles), Tandragee (10.2 miles), Portadown (10.3 miles)
Distance to Craigavon
about 13.1 miles
First visit
Free, no obligation

About an extra bedroom and en-suite extension

An extra bedroom and en-suite extension is a two-storey extension planned around a new double bedroom with its own shower room on the first floor, with a ground-floor room below. It is one of the most effective ways to add space for a growing family. Nationwide's 2025 research linked adding a double bedroom and bathroom to a three-bed, one-bathroom house with value gains of up to 24%.

We cover Armagh (BT61) and the places around it, including Keady (7.0 miles), Tandragee (10.2 miles) and Portadown.

What it costs in Armagh

For budgeting in Armagh, allow around £49,500–£66,500 (plus £5,500–£11,000 for the en-suite) for an extra bedroom and en-suite extension with a 4 m × 3.5 m footprint on two floors (28 m² of new floor space). That's based on £1,760–£2,380 per m² including VAT for Northern Ireland. The fastest way to a firmer number is a free site visit, after which we price the design stage in writing.

SpecPer m²A 4 m × 3.5 m footprint on two floors (28 m² of new floor space)
Essential£1,620–£2,190 per m²£45,500–£61,000
Standard£1,760–£2,380 per m²£49,500–£66,500
Premium£2,110–£2,850 per m²£59,000–£80,000

Planning and building control in Armagh

In Northern Ireland, a rear extra bedroom extension can be permitted development within 3 m of the original rear wall and 7 m from the rear boundary. Upper side windows within 15 m of a neighbouring boundary must be obscure-glazed and non-opening. Other designs need a planning application costing £347, plus building control approval.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Armagh homes

Escape window and fire safety

A new first-floor bedroom needs an escape window with a clear opening of at least 0.33 m², at least 450 mm wide and high, and the bottom no more than 1,100 mm above the floor, unless there is a protected route to the stairs. We design the windows to meet this.

Connecting to the landing

The new bedroom must be reached from the existing landing, usually through a new opening in the outside wall or by taking part of an existing bedroom as a corridor. We look at the stairs and landing first, because a poor connection can waste much of the new space.

How we'd run your project

  1. Measure and listen

    A visit to Armagh to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.

  2. Drawings and permission

    Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Armagh.

  3. Structure and building control

    A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Questions about extra bedroom and en-suite extensions in Armagh

How long does an extra bedroom and en-suite extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Which postcodes do you cover around Armagh?

We cover Armagh (BT61) and nearby places including Keady, Tandragee and Portadown, plus the rest of County Armagh. The first site visit is free.

Who handles building control for a project in Armagh?

We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

What goes on the ground floor below a new bedroom?

Whatever suits you: a bigger kitchen, a family room, a study, a utility or a downstairs shower room. The ground floor usually costs about the same whatever it is used for, apart from kitchen units and bathroom fittings, which are priced separately.

How big should a new double bedroom be?

There is no legal minimum size for a bedroom in a house you own, so the test is whether it works. A comfortable double needs room for the bed with space to walk round it, wardrobes and a door that opens freely. We draw furniture on the plans so you can judge the space before anything is built.

Nearby

The same service in neighbouring towns:

Other extensions in Armagh

All two-storey extension services in Armagh · Extra bedroom and en-suite extensions across County Armagh

Tell us about your house in Armagh and we'll call you back to arrange a free, no-obligation visit.