Limavady · County Londonderry

Extra bedroom and en-suite extensions in Limavady

If you live in Limavady and need more room without moving, an extra bedroom and en-suite extension is worth a serious look. We handle the drawings, approvals, structure and build.

What we'd confirm first for a project in Limavady.

Postcode districts
BT49
County / area
County Londonderry, Northern Ireland
Price region
Northern Ireland
Guide price
£49,500–£66,500 (£1,760–£2,380 per m²), plus £5,500–£11,000 for the en-suite
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Nearest towns
Dungiven (8.2 miles), Eglinton (9.5 miles), Culmore (12.5 miles)
Distance to Derry
about 14.7 miles
First visit
Free, no obligation

About an extra bedroom and en-suite extension

An extra bedroom and en-suite extension is a two-storey extension planned around a new double bedroom with its own shower room on the first floor, with a ground-floor room below. It is one of the most effective ways to add space for a growing family. Nationwide's 2025 research linked adding a double bedroom and bathroom to a three-bed, one-bathroom house with value gains of up to 24%.

We cover postcode district BT49 in and around Limavady, along with neighbouring Dungiven, Eglinton and Culmore.

What it costs in Limavady

Guide prices for extra bedroom and en-suite extensions in Northern Ireland are around £1,760–£2,380 per m² of new floor space, including VAT. For a typical project with a 4 m × 3.5 m footprint on two floors (28 m² of new floor space), that's roughly £49,500–£66,500 (plus £5,500–£11,000 for the en-suite). Professional fees for drawings and the structural engineer are listed separately on our prices page.

SpecPer m²A 4 m × 3.5 m footprint on two floors (28 m² of new floor space)
Essential£1,620–£2,190 per m²£45,500–£61,000
Standard£1,760–£2,380 per m²£49,500–£66,500
Premium£2,110–£2,850 per m²£59,000–£80,000

Planning and building control in Limavady

In Northern Ireland, a rear extra bedroom extension can be permitted development within 3 m of the original rear wall and 7 m from the rear boundary. Upper side windows within 15 m of a neighbouring boundary must be obscure-glazed and non-opening. Other designs need a planning application costing £347, plus building control approval.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Limavady homes

Connecting to the landing

The new bedroom must be reached from the existing landing, usually through a new opening in the outside wall or by taking part of an existing bedroom as a corridor. We look at the stairs and landing first, because a poor connection can waste much of the new space.

Sound and privacy

Bedrooms above a kitchen or family room benefit from an insulated floor to reduce noise. Side-facing upstairs windows usually have to be obscure-glazed, so we place the main bedroom window to the rear and the en-suite window to the side where possible.

How we'd run your project

  1. Free site visit

    We visit your home in Limavady, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Limavady and deal with any questions from the planning officer.

  3. Detail and price

    Construction drawings, engineer's calculations and building control sign-off, then a written fixed price for the build.

  4. Build

    Foundations, walls, floor, roof, windows, then first and second fix. We break through into the house as late as we can.

Questions about extra bedroom and en-suite extensions in Limavady

Who handles building control for a project in Limavady?

We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Do I need planning permission for an extra bedroom and en-suite extension in Limavady?

Limavady is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

How long does an extra bedroom and en-suite extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

How big should a new double bedroom be?

There is no legal minimum size for a bedroom in a house you own, so the test is whether it works. A comfortable double needs room for the bed with space to walk round it, wardrobes and a door that opens freely. We draw furniture on the plans so you can judge the space before anything is built.

What goes on the ground floor below a new bedroom?

Whatever suits you: a bigger kitchen, a family room, a study, a utility or a downstairs shower room. The ground floor usually costs about the same whatever it is used for, apart from kitchen units and bathroom fittings, which are priced separately.

Nearby

The same service in neighbouring towns:

Other extensions in Limavady

All two-storey extension services in Limavady · Extra bedroom and en-suite extensions across County Londonderry

Ready to talk it through? Call us or send the form and we'll arrange a visit to your home in Limavady.

CallGuide price