Camberley · Surrey

First-floor extensions in Camberley

For a first-floor extension in Camberley, the first questions are always the same: how big, which approvals, and what it will cost. This page answers all three for Surrey.

Before you start in Camberley, here's what applies.

Postcode districts
GU15, GU18 and GU19
County / area
Surrey, England
Price region
South East England
Guide price
£27,500–£40,000 (£1,980–£2,860 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
Nearest towns
Frimley (1.4 miles), Sandhurst (2 miles), Farnborough (Hampshire) (3 miles)
Distance to Woking
about 8 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension suits you if your house already has a single-storey extension and you need more space upstairs. You get a structural check of the existing walls and foundations, a design that ties the new floor into the house, the approvals your nation needs, building regulations approval and the build, managed by us and carried out by vetted teams working under S&K.

We cover postcode districts GU15, GU18 and GU19 in and around Camberley, along with neighbouring Frimley, Sandhurst and Farnborough (Hampshire).

What it costs in Camberley

Using our South East England rates, a first-floor extension with 4 m × 3.5 m of new first-floor space (14 m²) comes to about £27,500–£40,000, including VAT. Bigger or more glazed designs cost more per m². Keep a contingency of around 10% for things nobody can see until the ground is opened up.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,820–£2,630 per m²£25,500–£37,000
Standard£1,980–£2,860 per m²£27,500–£40,000
Premium£2,380–£3,430 per m²£33,500–£48,000

Planning and building regulations in Camberley

In England, adding a first floor turns a single-storey extension into one of more than one storey. To be permitted development, the extension as a whole must go no more than 3 m beyond the rear wall of the original house and stay at least 7 m from the rear boundary, with matching materials and roof pitch. Over a side extension it always needs planning permission, costing £548 (or £575 for applications made from 8 December 2026).

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

Design points for Camberley homes

Replacing the flat roof

The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.

Matching the roofline

A first-floor extension often changes how the back or side of the house looks more than the original single storey did. Matching the main roof pitch and materials, and keeping the ridge below the main ridge, usually gives the best result and is expected for permitted development in England.

How we'd run your project

  1. Understand the brief

    At your home in Camberley we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.

  2. Drawings, then consent

    We draw the scheme, check it against the rules in England, and take it through the right consent with the council.

  3. Price it properly

    Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Questions about first-floor extensions in Camberley

Which postcodes do you cover around Camberley?

We cover Camberley (GU15, GU18 and GU19) and nearby places including Frimley, Sandhurst and Farnborough (Hampshire), plus the rest of Surrey. The first site visit is free.

How much does a first-floor extension cost in Camberley?

Our guide for South East England, which covers Camberley, is £1,980–£2,860 per m² including VAT. A typical project with 4 m × 3.5 m of new first-floor space (14 m²) comes to about £27,500–£40,000. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Nearby

The same service in neighbouring towns:

Other extensions in Camberley

All two-storey extension services in Camberley · First-floor extensions across Surrey

Send us your postcode and a few details. We'll get back to you to arrange a visit and talk through your options.

CallGuide price