First-floor extensions in Chatteris
For a first-floor extension in Chatteris, the first questions are always the same: how big, which approvals, and what it will cost. This page answers all three for Cambridgeshire.
Useful details for planning a first-floor extension in Chatteris.
- Postcode districts
- PE16 and PE26
- County / area
- Cambridgeshire, England
- Price region
- East of England
- Guide price
- £26,000–£37,500 (£1,850–£2,680 per m²)
- Approval route
- It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
- Nearest towns
- March (6.7 miles), Ely (9.7 miles), St Ives (10.1 miles)
- Distance to Peterborough
- about 15 miles
- First visit
- Free, no obligation
About a first-floor extension
A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.
We cover postcode districts PE16 and PE26 in and around Chatteris, along with neighbouring March, Ely and St Ives.
What it costs in Chatteris
Guide prices for first-floor extensions in the East of England are around £1,850–£2,680 per m² of new floor space, including VAT. For a typical project with 4 m × 3.5 m of new first-floor space (14 m²), that's roughly £26,000–£37,500. Keep a contingency of around 10% for things nobody can see until the ground is opened up.
| Spec | Per m² | 4 m × 3.5 m of new first-floor space (14 m²) |
|---|---|---|
| Essential | £1,710–£2,460 per m² | £24,000–£34,500 |
| Standard | £1,850–£2,680 per m² | £26,000–£37,500 |
| Premium | £2,220–£3,210 per m² | £31,000–£45,000 |
Planning and building regulations in Chatteris
In England, adding a first floor turns a single-storey extension into one of more than one storey. To be permitted development, the extension as a whole must go no more than 3 m beyond the rear wall of the original house and stay at least 7 m from the rear boundary, with matching materials and roof pitch. Over a side extension it always needs planning permission, costing £548 (or £575 for applications made from 8 December 2026).
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
Design points for Chatteris homes
Replacing the flat roof
The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.
Tying into the house
The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.
How we'd run your project
Start at your house
We come to your home in Chatteris, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Choose the approval route
Some designs fit permitted development, most need a householder application. We decide which applies in England before drawing in detail.
Engineer it
Foundations sized for two floors, steels for any openings, and building control approval, all before anyone starts on site.
Build it
The new structure goes up first, then we open into the house, finish inside and get the completion certificate.
Questions about first-floor extensions in Chatteris
Which postcodes do you cover around Chatteris?
We cover Chatteris (PE16 and PE26) and nearby places including March, Ely and St Ives, plus the rest of Cambridgeshire. The first site visit is free.
How much does a first-floor extension cost in Chatteris?
Our guide for the East of England, which covers Chatteris, is £1,850–£2,680 per m² including VAT. A typical project with 4 m × 3.5 m of new first-floor space (14 m²) comes to about £26,000–£37,500. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.
How long does a first-floor extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Will the first-floor extension match my house?
It should, and in England matching materials and roof pitch is a condition of permitted development. We match brick, tile, mortar colour and window style where we can, and tell you at the design stage if an exact brick match is not available, so you can choose between the closest match and render or cladding.
Can I build on top of my existing single-storey extension?
Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.
Nearby
Close to Chatteris? We work across the area, including:
Other extensions in Chatteris
- Rear
- Side
- Wraparound
- Part two-storey
- Over a garage
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Chatteris · First-floor extensions across Cambridgeshire
Book a free site visit in Chatteris and we'll tell you what's possible, what approvals you need and what the design stage would cost.