Dundee and Angus · Scotland

First-floor extensions in Dundee and Angus

From first sketch to completion certificate, we deliver first-floor extensions for homeowners across Dundee and Angus.

Dundee and Angus at a glance

Nation
Scotland
Price region
Scotland
Postcode areas
DD
Towns covered
8 listed below, plus surrounding villages
Approval route
Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
Site visits
Free, no obligation

What a first-floor extension involves

A first-floor extension suits you if your house already has a single-storey extension and you need more space upstairs. You get a structural check of the existing walls and foundations, a design that ties the new floor into the house, the approvals your nation needs, a building warrant and the build, managed by us and carried out by vetted teams working under S&K.

Across Dundee and Angus we cover Dundee (DD1), Arbroath (DD11), Forfar (DD8), Carnoustie (DD7), Monifieth (DD5) and Brechin (DD9), plus the smaller places around them.

Guide price in Scotland

Our guide for Scotland is £1,690–£2,440 per m² including VAT. On a project with 4 m × 3.5 m of new first-floor space (14 m²), that puts a first-floor extension in Dundee and Angus at roughly £23,500–£34,000. We'll give you a written design-stage price first, then a fixed build price once the drawings are agreed.

SpecPer m²Typical project
Essential£1,560–£2,250 per m²£22,000–£31,500
Standard£1,690–£2,440 per m²£23,500–£34,000
Premium£2,030–£2,930 per m²£28,500–£41,000

Rules in Scotland

In Scotland, permitted development for extensions of more than one storey (Class 1B) needs at least 10 m to every boundary and no part higher than the house. Most first-floor extensions cannot meet the 10 m test, so plan for a householder application (£371, decided within two months) and a building warrant before work starts.

Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.

Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.

There is no Party Wall Act in Scotland. Shared walls and boundaries are governed by title deeds and common law, so we speak to neighbours early and record the condition of shared structures.

Getting the design right

Tying into the house

The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.

Replacing the flat roof

The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.

How we work in Dundee and Angus

  1. Look at the house

    We start in Dundee and Angus with a free visit: measurements, photos, a look at the loft and drains, and a frank chat about budget.

  2. Choose the approval route

    Some designs fit permitted development, most need a householder application. We decide which applies in Scotland before drawing in detail.

  3. Fixed price in writing

    With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Towns we cover in Dundee and Angus

First-floor extensions in Dundee and Angus: questions

How much does a first-floor extension cost in Dundee and Angus?

In Scotland our guide is £1,690–£2,440 per m² including VAT, so about £23,500–£34,000 for 4 m × 3.5 m of new first-floor space (14 m²). Essential and Premium specs move that by roughly 8% down or 20% up.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original a building warrant and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Will I need planning permission in Dundee and Angus?

Dundee and Angus is in Scotland. Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.

Neighbouring areas

All extension services in Dundee and Angus · About first-floor extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price