First-floor extensions in Greenford
Our first-floor extensions service in Greenford covers everything: measured survey, design, planning or permitted development checks, structural design, building control and the build itself.
Greenford: the key facts for this kind of project.
- Postcode districts
- UB6
- County / area
- Greater London, England
- Price region
- London
- Guide price
- £30,000–£43,500 (£2,160–£3,120 per m²)
- Approval route
- It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
- Nearest towns
- Northolt (1.5 miles), Southall (1.5 miles), West Ealing (1.7 miles)
- First visit
- Free, no obligation
About a first-floor extension
A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.
We cover postcode district UB6 in and around Greenford, along with neighbouring Northolt, Southall and West Ealing.
What it costs in Greenford
Guide prices for first-floor extensions in London are around £2,160–£3,120 per m² of new floor space, including VAT. For a typical project with 4 m × 3.5 m of new first-floor space (14 m²), that's roughly £30,000–£43,500. These are guides, not quotes. Ground conditions, steelwork and access can move the figure either way.
| Spec | Per m² | 4 m × 3.5 m of new first-floor space (14 m²) |
|---|---|---|
| Essential | £1,990–£2,870 per m² | £28,000–£40,000 |
| Standard | £2,160–£3,120 per m² | £30,000–£43,500 |
| Premium | £2,590–£3,740 per m² | £36,500–£52,500 |
Planning and building regulations in Greenford
In England, adding a first floor turns a single-storey extension into one of more than one storey. To be permitted development, the extension as a whole must go no more than 3 m beyond the rear wall of the original house and stay at least 7 m from the rear boundary, with matching materials and roof pitch. Over a side extension it always needs planning permission, costing £548 (or £575 for applications made from 8 December 2026).
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
Design points for Greenford homes
Replacing the flat roof
The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.
Can the existing structure take it?
Many single-storey extensions were built with foundations, walls and lintels sized for one storey. We find out what is there with trial holes and, where available, the original building control drawings. The engineer then decides whether to reuse, strengthen or rebuild parts of the structure.
How we'd run your project
Measure and listen
A visit to Greenford to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.
Drawings, then consent
We draw the scheme, check it against the rules in England, and take it through the right consent with the council.
Technical design
We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.
Build
Foundations, walls, floor, roof, windows, then first and second fix. We break through into the house as late as we can.
Questions about first-floor extensions in Greenford
How long does a first-floor extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Do I need planning permission for a first-floor extension in Greenford?
Greenford is in England, so England planning rules apply. It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.
How much does a first-floor extension cost in Greenford?
Our guide for London, which covers Greenford, is £2,160–£3,120 per m² including VAT. A typical project with 4 m × 3.5 m of new first-floor space (14 m²) comes to about £30,000–£43,500. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.
Can I build on top of my existing single-storey extension?
Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.
Will the first-floor extension match my house?
It should, and in England matching materials and roof pitch is a condition of permitted development. We match brick, tile, mortar colour and window style where we can, and tell you at the design stage if an exact brick match is not available, so you can choose between the closest match and render or cladding.
Nearby
Close to Greenford? We work across the area, including:
Other extensions in Greenford
- Rear
- Side
- Wraparound
- Part two-storey
- Over a garage
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite