Kew · Greater London

First-floor extensions in Kew

We cover Kew and the rest of Greater London for first-floor extensions. Start with a free site visit and a plain-English view of what your house and plot can take.

Quick reference for homeowners in Kew.

Postcode districts
TW8
County / area
Greater London, England
Price region
London
Guide price
£30,000–£43,500 (£2,160–£3,120 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
Nearest towns
Brentford (0.9 miles), Mortlake (1.2 miles), Chiswick (1.5 miles)
First visit
Free, no obligation

About a first-floor extension

A first-floor extension suits you if your house already has a single-storey extension and you need more space upstairs. You get a structural check of the existing walls and foundations, a design that ties the new floor into the house, the approvals your nation needs, building regulations approval and the build, managed by us and carried out by vetted teams working under S&K.

We cover postcode district TW8 in and around Kew, along with neighbouring Brentford, Mortlake and Chiswick.

What it costs in Kew

Our guide for London is £2,160–£3,120 per m² including VAT. On a project with 4 m × 3.5 m of new first-floor space (14 m²), that puts a first-floor extension in Kew at roughly £30,000–£43,500. Professional fees for drawings and the structural engineer are listed separately on our prices page.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,990–£2,870 per m²£28,000–£40,000
Standard£2,160–£3,120 per m²£30,000–£43,500
Premium£2,590–£3,740 per m²£36,500–£52,500

Planning and building regulations in Kew

In England, adding a first floor turns a single-storey extension into one of more than one storey. To be permitted development, the extension as a whole must go no more than 3 m beyond the rear wall of the original house and stay at least 7 m from the rear boundary, with matching materials and roof pitch. Over a side extension it always needs planning permission, costing £548 (or £575 for applications made from 8 December 2026).

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

Design points for Kew homes

Tying into the house

The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.

Replacing the flat roof

The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.

How we'd run your project

  1. Free site visit

    We visit your home in Kew, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Kew and deal with any questions from the planning officer.

  3. Technical design

    We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Questions about first-floor extensions in Kew

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Who handles building regulations for a project in Kew?

We handle it as part of the project. What's needed in England: building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Do I need planning permission for a first-floor extension in Kew?

Kew is in England, so England planning rules apply. It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Will the first-floor extension match my house?

It should, and in England matching materials and roof pitch is a condition of permitted development. We match brick, tile, mortar colour and window style where we can, and tell you at the design stage if an exact brick match is not available, so you can choose between the closest match and render or cladding.

Nearby

We also cover places near Kew, including:

Other extensions in Kew

All two-storey extension services in Kew · First-floor extensions across Greater London

The quickest next step is a visit. We'll look at your house in Kew and give you an honest view of the options.