Milngavie · Glasgow and Dunbartonshire

First-floor extensions in Milngavie

For a first-floor extension in Milngavie, the first questions are always the same: how big, which approvals, and what it will cost. This page answers all three for Glasgow and Dunbartonshire.

Before you start in Milngavie, here's what applies.

Postcode districts
G62
County / area
Glasgow and Dunbartonshire, Scotland
Price region
Scotland
Guide price
£23,500–£34,000 (£1,690–£2,440 per m²)
Approval route
Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
Nearest towns
Bearsden (1.8 miles), Duntocher (3.7 miles), Clydebank (4.2 miles)
Distance to Glasgow
about 5.8 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.

Around Milngavie we also work in Bearsden, Duntocher and Clydebank, and across the rest of Glasgow and Dunbartonshire. Postcode district in and near Milngavie: G62.

What it costs in Milngavie

Our guide for Scotland is £1,690–£2,440 per m² including VAT. On a project with 4 m × 3.5 m of new first-floor space (14 m²), that puts a first-floor extension in Milngavie at roughly £23,500–£34,000. Kitchens, bathroom fittings and flooring are priced separately so you can compare like with like.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,560–£2,250 per m²£22,000–£31,500
Standard£1,690–£2,440 per m²£23,500–£34,000
Premium£2,030–£2,930 per m²£28,500–£41,000

Planning and building standards in Milngavie

In Scotland, permitted development for extensions of more than one storey (Class 1B) needs at least 10 m to every boundary and no part higher than the house. Most first-floor extensions cannot meet the 10 m test, so plan for a householder application (£371, decided within two months) and a building warrant before work starts.

Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.

Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.

Design points for Milngavie homes

Tying into the house

The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.

Replacing the flat roof

The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.

How we'd run your project

  1. Free site visit

    We visit your home in Milngavie, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Drawings and permission

    Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Milngavie.

  3. Detail and price

    Construction drawings, engineer's calculations and building warrant approval, then a written fixed price for the build.

  4. Finish and certify

    Second fix, plastering and making good, then the council's final building standards inspection and the completion paperwork.

Questions about first-floor extensions in Milngavie

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Who handles building standards for a project in Milngavie?

We handle it as part of the project. What's needed in Scotland: a building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Which postcodes do you cover around Milngavie?

We cover Milngavie (G62) and nearby places including Bearsden, Duntocher and Clydebank, plus the rest of Glasgow and Dunbartonshire. The first site visit is free.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original a building warrant and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

Nearby

Other towns near Milngavie:

Other extensions in Milngavie

All two-storey extension services in Milngavie · First-floor extensions across Glasgow and Dunbartonshire

Send us your postcode and a few details. We'll get back to you to arrange a visit and talk through your options.

CallGuide price