Monmouth · Gwent

First-floor extensions in Monmouth

Thinking about a first-floor extension in Monmouth? We design it, take it through the approvals it needs and build it, with one team responsible from the first visit to the final certificate.

The basics for Monmouth at a glance.

Postcode districts
NP25
County / area
Gwent, Wales
Price region
Wales
Guide price
£23,000–£33,500 (£1,660–£2,390 per m²)
Approval route
It may be permitted development if the ground floor goes no more than 4 m and the first floor no more than 3 m beyond the original rear wall, with the first floor 10.5 m from the rear boundary.
Nearest towns
Chepstow (12 miles), Abergavenny (13 miles), Caldicot (15.7 miles)
Distance to Newport (Gwent)
about 19.8 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.

Monmouth sits about 19.8 miles from Newport (Gwent). Closer to home, Chepstow is 12.0 miles away and Abergavenny 13.0 miles.

What it costs in Monmouth

Expect a first-floor extension in Monmouth to land somewhere around £23,000–£33,500 for 4 m × 3.5 m of new first-floor space (14 m²). Our Wales guide rate is £1,660–£2,390 per m², including VAT. These are guides, not quotes. Ground conditions, steelwork and access can move the figure either way.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,520–£2,200 per m²£21,500–£31,000
Standard£1,660–£2,390 per m²£23,000–£33,500
Premium£1,990–£2,870 per m²£28,000–£40,000

Planning and building regulations in Monmouth

In Wales, a first floor over a rear extension can be permitted development if it goes no more than 3 m beyond the original rear wall and stays at least 10.5 m from the rear boundary, with the ground floor within 4 m. Over a side extension, the 10.5 m, 1 m set-back and 50% width tests apply. Otherwise a householder application costs £585.

Approval in Wales: Householder planning application: £585. Councils normally decide householder applications within 8 weeks.

Building regulations: Building regulations approval under the Welsh Approved Documents, which differ from England's in places (notably energy efficiency).

Design points for Monmouth homes

Escape and fire safety

A new first-floor bedroom needs an escape window with a clear opening of at least 0.33 m², at least 450 mm wide and 450 mm high, with the bottom no more than 1,100 mm above the floor, unless there is a protected route to the stairs.

Replacing the flat roof

The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.

How we'd run your project

  1. Start at your house

    We come to your home in Monmouth, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.

  2. Drawings, then consent

    We draw the scheme, check it against the rules in Wales, and take it through the right consent with the council.

  3. Technical design

    We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.

  4. Finish and certify

    Second fix, plastering and making good, then building control's final inspection and the completion paperwork.

Questions about first-floor extensions in Monmouth

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils normally decide householder applications within 8 weeks), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Do I need planning permission for a first-floor extension in Monmouth?

Monmouth is in Wales, so Wales planning rules apply. It may be permitted development if the ground floor goes no more than 4 m and the first floor no more than 3 m beyond the original rear wall, with the first floor 10.5 m from the rear boundary. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.

Who handles building regulations for a project in Monmouth?

We handle it as part of the project. What's needed in Wales: building regulations approval under the Welsh Approved Documents, which differ from England's in places (notably energy efficiency). We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original building control approval and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

Nearby

The same service in neighbouring towns:

Other extensions in Monmouth

All two-storey extension services in Monmouth · First-floor extensions across Gwent

Book a free site visit in Monmouth and we'll tell you what's possible, what approvals you need and what the design stage would cost.

CallGuide price