First-floor extensions in Peterhead
Our first-floor extensions service in Peterhead covers everything: measured survey, design, planning or permitted development checks, structural design, building control and the build itself.
What we'd confirm first for a project in Peterhead.
- Postcode districts
- AB42
- County / area
- Aberdeen and Aberdeenshire, Scotland
- Price region
- Scotland
- Guide price
- £23,500–£34,000 (£1,690–£2,440 per m²)
- Approval route
- Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
- Nearest towns
- Ellon (14.5 miles), Fraserburgh (15.3 miles), Dyce (25.4 miles)
- Distance to Aberdeen
- about 27.6 miles
- First visit
- Free, no obligation
About a first-floor extension
A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.
We cover Peterhead (AB42) and the places around it, including Ellon (14.5 miles), Fraserburgh (15.3 miles) and Dyce.
What it costs in Peterhead
A guide price for Peterhead: around £23,500–£34,000 for 4 m × 3.5 m of new first-floor space (14 m²). That works out at £1,690–£2,440 per m² of new floor space, including VAT at 20%. These are guides, not quotes. Ground conditions, steelwork and access can move the figure either way.
| Spec | Per m² | 4 m × 3.5 m of new first-floor space (14 m²) |
|---|---|---|
| Essential | £1,560–£2,250 per m² | £22,000–£31,500 |
| Standard | £1,690–£2,440 per m² | £23,500–£34,000 |
| Premium | £2,030–£2,930 per m² | £28,500–£41,000 |
Planning and building standards in Peterhead
In Scotland, permitted development for extensions of more than one storey (Class 1B) needs at least 10 m to every boundary and no part higher than the house. Most first-floor extensions cannot meet the 10 m test, so plan for a householder application (£371, decided within two months) and a building warrant before work starts.
Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.
Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.
Design points for Peterhead homes
Tying into the house
The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.
Replacing the flat roof
The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.
How we'd run your project
Visit and first ideas
One of our team visits your house in Peterhead, checks the walls, roof and drains, and sketches out options with you.
Design and approvals
We draw the extension and check it against the rules for Scotland, then apply for planning permission or a certificate of lawfulness, whichever fits.
Price it properly
Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.
Finish and certify
Second fix, plastering and making good, then the council's final building standards inspection and the completion paperwork.
Questions about first-floor extensions in Peterhead
Who handles building standards for a project in Peterhead?
We handle it as part of the project. What's needed in Scotland: a building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Which postcodes do you cover around Peterhead?
We cover Peterhead (AB42) and nearby places including Ellon, Fraserburgh and Dyce, plus the rest of Aberdeen and Aberdeenshire. The first site visit is free.
How long does a first-floor extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Can I build on top of my existing single-storey extension?
Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original a building warrant and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.
What happens to the room below while the first floor is built?
The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.
Nearby
Other towns near Peterhead:
Other extensions in Peterhead
- Rear
- Side
- Wraparound
- Part two-storey
- Over a garage
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Peterhead · First-floor extensions across Aberdeen and Aberdeenshire
Tell us about your house in Peterhead and we'll call you back to arrange a free, no-obligation visit.