Port Glasgow · Renfrewshire and Inverclyde

First-floor extensions in Port Glasgow

We plan and build first-floor extensions for homeowners in Port Glasgow and nearby. Every project starts with a free visit and a design stage priced in writing before any work begins.

Useful details for planning a first-floor extension in Port Glasgow.

Postcode districts
PA14
County / area
Renfrewshire and Inverclyde, Scotland
Price region
Scotland
Guide price
£23,500–£34,000 (£1,690–£2,440 per m²)
Approval route
Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
Nearest towns
Greenock (2.9 miles), Dumbarton (4.6 miles), Vale of Leven (5 miles)
Distance to Paisley
about 12.2 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.

Port Glasgow sits about 12.2 miles from Paisley. Closer to home, Greenock is 2.9 miles away and Dumbarton 4.6 miles.

What it costs in Port Glasgow

Most of the cost of a first-floor extension is set by its size and specification. For Port Glasgow and the rest of Scotland, our guide is £1,690–£2,440 per m² including VAT, so about £23,500–£34,000 for 4 m × 3.5 m of new first-floor space (14 m²). Keep a contingency of around 10% for things nobody can see until the ground is opened up.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,560–£2,250 per m²£22,000–£31,500
Standard£1,690–£2,440 per m²£23,500–£34,000
Premium£2,030–£2,930 per m²£28,500–£41,000

Planning and building standards in Port Glasgow

In Scotland, permitted development for extensions of more than one storey (Class 1B) needs at least 10 m to every boundary and no part higher than the house. Most first-floor extensions cannot meet the 10 m test, so plan for a householder application (£371, decided within two months) and a building warrant before work starts.

Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.

Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.

Design points for Port Glasgow homes

Can the existing structure take it?

Many single-storey extensions were built with foundations, walls and lintels sized for one storey. We find out what is there with trial holes and, where available, the original building standards drawings. The engineer then decides whether to reuse, strengthen or rebuild parts of the structure.

Tying into the house

The new floor and walls must line up with the existing first floor, often through a new opening in the rear wall above the old one. Floor levels, the position of upstairs windows and the existing roof all affect where the opening can go, so we survey both floors carefully.

How we'd run your project

  1. Free site visit

    We visit your home in Port Glasgow, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Choose the approval route

    Some designs fit permitted development, most need a householder application. We decide which applies in Scotland before drawing in detail.

  3. Engineer it

    Foundations sized for two floors, steels for any openings, and a building warrant, all before anyone starts on site.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Questions about first-floor extensions in Port Glasgow

Who handles building standards for a project in Port Glasgow?

We handle it as part of the project. What's needed in Scotland: a building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Do I need planning permission for a first-floor extension in Port Glasgow?

Port Glasgow is in Scotland. Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Can I build on top of my existing single-storey extension?

Often yes, but only after the structure has been checked. Foundations, walls and lintels built for one storey may not carry two. We dig trial holes, look for the original a building warrant and ask the structural engineer to confirm what can stay, what needs strengthening and what must be rebuilt.

Nearby

Other towns near Port Glasgow:

Other extensions in Port Glasgow

All two-storey extension services in Port Glasgow · First-floor extensions across Renfrewshire and Inverclyde

Tell us about your house in Port Glasgow and we'll call you back to arrange a free, no-obligation visit.

CallGuide price