South Hayling · Hampshire

First-floor extensions in South Hayling

We plan and build first-floor extensions for homeowners in South Hayling and nearby. Every project starts with a free visit and a design stage priced in writing before any work begins.

Quick reference for homeowners in South Hayling.

Postcode districts
PO11
County / area
Hampshire, England
Price region
South East England
Guide price
£27,500–£40,000 (£1,980–£2,860 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
Nearest towns
Hayling Island (0.5 miles), Emsworth (4.5 miles), Havant (4.8 miles)
Distance to Southampton
about 20.3 miles
First visit
Free, no obligation

About a first-floor extension

A first-floor extension is a new upstairs room built on top of an existing single-storey part of your house, such as a rear kitchen extension, a utility or a side annexe. It adds a bedroom, bathroom or study without enlarging the footprint. Whether it works depends mainly on whether the walls and foundations below can carry the extra load.

Around South Hayling we also work in Hayling Island, Emsworth and Havant, and across the rest of Hampshire. Postcode district in and near South Hayling: PO11.

What it costs in South Hayling

A guide price for South Hayling: around £27,500–£40,000 for 4 m × 3.5 m of new first-floor space (14 m²). That works out at £1,980–£2,860 per m² of new floor space, including VAT at 20%. Professional fees for drawings and the structural engineer are listed separately on our prices page.

SpecPer m²4 m × 3.5 m of new first-floor space (14 m²)
Essential£1,820–£2,630 per m²£25,500–£37,000
Standard£1,980–£2,860 per m²£27,500–£40,000
Premium£2,380–£3,430 per m²£33,500–£48,000

Planning and building regulations in South Hayling

In England, adding a first floor turns a single-storey extension into one of more than one storey. To be permitted development, the extension as a whole must go no more than 3 m beyond the rear wall of the original house and stay at least 7 m from the rear boundary, with matching materials and roof pitch. Over a side extension it always needs planning permission, costing £548 (or £575 for applications made from 8 December 2026).

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

Design points for South Hayling homes

Matching the roofline

A first-floor extension often changes how the back or side of the house looks more than the original single storey did. Matching the main roof pitch and materials, and keeping the ridge below the main ridge, usually gives the best result and is expected for permitted development in England.

Replacing the flat roof

The existing roof usually comes off and is replaced by a new first-floor structure. The room below is exposed for a short time, so we plan temporary weatherproofing and sequence the work to keep the kitchen or living room usable for as long as possible.

How we'd run your project

  1. Measure and listen

    A visit to South Hayling to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.

  2. Plans, then approval

    Measured survey, design, then the right approval route for your house. We explain each step before we take it.

  3. Price it properly

    Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.

  4. Finish and certify

    Second fix, plastering and making good, then building control's final inspection and the completion paperwork.

Questions about first-floor extensions in South Hayling

How long does a first-floor extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Which postcodes do you cover around South Hayling?

We cover South Hayling (PO11) and nearby places including Hayling Island, Emsworth and Havant, plus the rest of Hampshire. The first site visit is free.

How much does a first-floor extension cost in South Hayling?

Our guide for South East England, which covers South Hayling, is £1,980–£2,860 per m² including VAT. A typical project with 4 m × 3.5 m of new first-floor space (14 m²) comes to about £27,500–£40,000. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.

What happens to the room below while the first floor is built?

The old roof is removed, so the room below is exposed for a short period. We fit temporary weather protection, plan the work so the roof comes off only when the new structure is ready, and agree with you which rooms will be out of use and for roughly how long.

Will the first-floor extension match my house?

It should, and in England matching materials and roof pitch is a condition of permitted development. We match brick, tile, mortar colour and window style where we can, and tell you at the design stage if an exact brick match is not available, so you can choose between the closest match and render or cladding.

Nearby

Close to South Hayling? We work across the area, including:

Other extensions in South Hayling

All two-storey extension services in South Hayling · First-floor extensions across Hampshire

Want a figure first? Try our guide price tool, then book a free visit to firm it up.