Billingham · County Durham

Kitchen extensions with bedrooms above in Billingham

Thinking about a kitchen extension with bedrooms above in Billingham? We design it, take it through the approvals it needs and build it, with one team responsible from the first visit to the final certificate.

Quick reference for homeowners in Billingham.

Postcode districts
TS20, TS22 and TS23
County / area
County Durham, England
Price region
North East England
Guide price
£50,500–£68,000 (£1,800–£2,430 per m²), kitchen units and worktops priced separately
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
Nearest towns
Stockton-on-Tees (1.8 miles), Middlesbrough (2.4 miles), Thornaby-on-Tees (3.9 miles)
Distance to Darlington
about 11.3 miles
First visit
Free, no obligation

About a kitchen extension with bedrooms above

A kitchen extension with bedrooms above is a two-storey extension designed so the ground floor becomes a larger, usually open-plan kitchen and dining space, with one or two bedrooms or a bathroom on the first floor. It is a natural fit for a two-storey rear extension. The key design issues are the steel beams that open up the house, glazing and ventilation.

We cover postcode districts TS20, TS22 and TS23 in and around Billingham, along with neighbouring Stockton-on-Tees, Middlesbrough and Thornaby-on-Tees.

What it costs in Billingham

For budgeting in Billingham, allow around £50,500–£68,000 (kitchen units and worktops priced separately) for a kitchen extension with bedrooms above with a 4 m × 3.5 m footprint on two floors (28 m² of new floor space). That's based on £1,800–£2,430 per m² including VAT for North East England. We'll give you a written design-stage price first, then a fixed build price once the drawings are agreed.

SpecPer m²A 4 m × 3.5 m footprint on two floors (28 m² of new floor space)
Essential£1,660–£2,240 per m²£46,500–£62,500
Standard£1,800–£2,430 per m²£50,500–£68,000
Premium£2,160–£2,920 per m²£60,500–£81,500

Planning and building regulations in Billingham

In England, a two-storey rear kitchen extension can be permitted development if it goes no more than 3 m beyond the rear wall of the original house and stays at least 7 m from the rear boundary, with matching materials and roof pitch, outside protected areas. No balconies are allowed. Deeper designs need planning permission, costing £548 (or £575 for applications made from 8 December 2026).

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

Design points for Billingham homes

Steel beams and the open-plan opening

Removing the old rear wall to make one large room means a steel beam, sometimes several, to carry the first floor and roof. The engineer sizes the steel and its supports, and we decide early whether you want a flush ceiling with the beam hidden or a downstand, as this affects ceiling heights.

Glazing and the Part L 25% rule

In England, new windows, roof lights and glazed doors in an extension are normally limited to 25% of the extension's floor area plus the area of any windows or doors removed. Larger glazing is possible, but needs SAP or compensating calculations, so we plan the rear doors around this from the start.

How we'd run your project

  1. Look at the house

    We start in Billingham with a free visit: measurements, photos, a look at the loft and drains, and a frank chat about budget.

  2. Design and approvals

    We draw the extension and check it against the rules for England, then apply for planning permission or a certificate of lawfulness, whichever fits.

  3. Engineer it

    Foundations sized for two floors, steels for any openings, and building control approval, all before anyone starts on site.

  4. Build and sign-off

    Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.

Questions about kitchen extensions with bedrooms above in Billingham

How long does a kitchen extension with bedrooms above take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Do I need planning permission for a kitchen extension with bedrooms above in Billingham?

Billingham is in England, so England planning rules apply. It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.

How much does a kitchen extension with bedrooms above cost in Billingham?

Our guide for North East England, which covers Billingham, is £1,800–£2,430 per m² including VAT. A typical project with a 4 m × 3.5 m footprint on two floors (28 m² of new floor space) comes to about £50,500–£68,000 (kitchen units and worktops priced separately). Design and approval fees are extra, and we fix the build price in writing once the design is agreed.

Can I keep using my kitchen during the build?

For part of it. The new structure can be built while your existing kitchen stays in use, but when the rear wall is opened and the new kitchen is fitted there will be several weeks without one. We plan when this happens and help you set up a temporary kitchen elsewhere in the house.

Is it cheaper to build a kitchen extension and bedrooms at the same time?

Yes, in most cases. Building both floors at once means one set of foundations, one roof, one scaffold and one set of approvals. Adding a first floor later means removing the original roof, possibly strengthening the foundations and disrupting the kitchen again. If you think you will need the bedroom, build it now.

Nearby

Close to Billingham? We work across the area, including:

Other extensions in Billingham

All two-storey extension services in Billingham · Kitchen extensions with bedrooms above across County Durham

The quickest next step is a visit. We'll look at your house in Billingham and give you an honest view of the options.

CallGuide price