Kitchen extensions with bedrooms above in Enniskillen
We plan and build kitchen extensions with bedrooms above for homeowners in Enniskillen and nearby. Every project starts with a free visit and a design stage priced in writing before any work begins.
What we'd confirm first for a project in Enniskillen.
- Postcode districts
- BT74
- County / area
- County Fermanagh, Northern Ireland
- Price region
- Northern Ireland
- Guide price
- £49,500–£66,500 (£1,760–£2,380 per m²), kitchen units and worktops priced separately
- Approval route
- It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
- Nearest towns
- Ballinamallard (4.4 miles), Irvinestown (8.3 miles), Lisnaskea (10.2 miles)
- First visit
- Free, no obligation
About a kitchen extension with bedrooms above
A kitchen extension with bedrooms above is a two-storey extension designed so the ground floor becomes a larger, usually open-plan kitchen and dining space, with one or two bedrooms or a bathroom on the first floor. It is a natural fit for a two-storey rear extension. The key design issues are the steel beams that open up the house, glazing and ventilation.
We cover Enniskillen (BT74) and the places around it, including Ballinamallard (4.4 miles), Irvinestown (8.3 miles) and Lisnaskea.
What it costs in Enniskillen
Guide prices for kitchen extensions with bedrooms above in Northern Ireland are around £1,760–£2,380 per m² of new floor space, including VAT. For a typical project with a 4 m × 3.5 m footprint on two floors (28 m² of new floor space), that's roughly £49,500–£66,500 (kitchen units and worktops priced separately). Design fees, structural calculations and approval fees are separate and listed on our prices page.
| Spec | Per m² | A 4 m × 3.5 m footprint on two floors (28 m² of new floor space) |
|---|---|---|
| Essential | £1,620–£2,190 per m² | £45,500–£61,000 |
| Standard | £1,760–£2,380 per m² | £49,500–£66,500 |
| Premium | £2,110–£2,850 per m² | £59,000–£80,000 |
Planning and building control in Enniskillen
In Northern Ireland, a kitchen extension with bedrooms above can be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary, with height, materials and roof pitch conditions. Otherwise a planning application costs £347 per dwelling, and building control approval from the council is needed.
Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.
Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.
Design points for Enniskillen homes
Bedrooms over a kitchen
Bedrooms above need an escape window or a protected route to the stairs, plus good sound insulation from the kitchen below. We position the stairs, landing and bedroom doors so the new rooms connect naturally to the existing first floor.
Services and drainage
Sinks, dishwashers and an upstairs bathroom all need waste routes to the drains, often near where the extension goes. We check the drains early and plan soil stacks, gas and electrical supplies so the kitchen layout is not limited later.
How we'd run your project
Start at your house
We come to your home in Enniskillen, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Drawings, then consent
We draw the scheme, check it against the rules in Northern Ireland, and take it through the right consent with the council.
Detail and price
Construction drawings, engineer's calculations and building control sign-off, then a written fixed price for the build.
On site
One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.
Questions about kitchen extensions with bedrooms above in Enniskillen
How long does a kitchen extension with bedrooms above take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Who handles building control for a project in Enniskillen?
We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Do I need planning permission for a kitchen extension with bedrooms above in Enniskillen?
Enniskillen is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Is it cheaper to build a kitchen extension and bedrooms at the same time?
Yes, in most cases. Building both floors at once means one set of foundations, one roof, one scaffold and one set of approvals. Adding a first floor later means removing the original roof, possibly strengthening the foundations and disrupting the kitchen again. If you think you will need the bedroom, build it now.
Can I keep using my kitchen during the build?
For part of it. The new structure can be built while your existing kitchen stays in use, but when the rear wall is opened and the new kitchen is fitted there will be several weeks without one. We plan when this happens and help you set up a temporary kitchen elsewhere in the house.
Nearby
Close to Enniskillen? We work across the area, including:
Other extensions in Enniskillen
All two-storey extension services in Enniskillen · Kitchen extensions with bedrooms above across County Fermanagh
Tell us about your house in Enniskillen and we'll call you back to arrange a free, no-obligation visit.