Kitchen extensions with bedrooms above in Pencoed
Adding a kitchen extension with bedrooms above in Pencoed gives you two new rooms stacked on one footprint. Here's how we'd approach it, what it typically costs and the rules that apply in Wales.
The basics for Pencoed at a glance.
- Postcode districts
- CF35
- County / area
- Mid Glamorgan, Wales
- Price region
- Wales
- Guide price
- £51,500–£69,500 (£1,840–£2,480 per m²), kitchen units and worktops priced separately
- Approval route
- It may be permitted development if the ground floor goes no more than 4 m and the first floor no more than 3 m beyond the original rear wall, with the first floor 10.5 m from the rear boundary.
- Nearest towns
- Brynna (1.9 miles), Coity (2.4 miles), Llanharan (2.8 miles)
- Distance to Rhondda
- about 9.6 miles
- First visit
- Free, no obligation
About a kitchen extension with bedrooms above
A kitchen extension with bedrooms above is a two-storey extension designed so the ground floor becomes a larger, usually open-plan kitchen and dining space, with one or two bedrooms or a bathroom on the first floor. It is a natural fit for a two-storey rear extension. The key design issues are the steel beams that open up the house, glazing and ventilation.
Pencoed sits about 9.6 miles from Rhondda. Closer to home, Brynna is 1.9 miles away and Coity 2.4 miles.
What it costs in Pencoed
In Wales, which includes Pencoed, we'd expect a kitchen extension with bedrooms above to cost around £51,500–£69,500 (kitchen units and worktops priced separately) for a 4 m × 3.5 m footprint on two floors (28 m² of new floor space), or £1,840–£2,480 per m² including VAT. Design fees, structural calculations and approval fees are separate and listed on our prices page.
| Spec | Per m² | A 4 m × 3.5 m footprint on two floors (28 m² of new floor space) |
|---|---|---|
| Essential | £1,690–£2,290 per m² | £47,500–£64,000 |
| Standard | £1,840–£2,480 per m² | £51,500–£69,500 |
| Premium | £2,210–£2,980 per m² | £62,000–£83,500 |
Planning and building regulations in Pencoed
In Wales, a kitchen extension with bedrooms above can be permitted development if the kitchen goes no more than 4 m and the first floor no more than 3 m beyond the original rear wall, with the first floor 10.5 m from the rear boundary. This lets the kitchen project further than the bedrooms. Otherwise a householder application costs £585.
Approval in Wales: Householder planning application: £585. Councils normally decide householder applications within 8 weeks.
Building regulations: Building regulations approval under the Welsh Approved Documents, which differ from England's in places (notably energy efficiency).
Design points for Pencoed homes
Steel beams and the open-plan opening
Removing the old rear wall to make one large room means a steel beam, sometimes several, to carry the first floor and roof. The engineer sizes the steel and its supports, and we decide early whether you want a flush ceiling with the beam hidden or a downstand, as this affects ceiling heights.
Services and drainage
Sinks, dishwashers and an upstairs bathroom all need waste routes to the drains, often near where the extension goes. We check the drains early and plan soil stacks, gas and electrical supplies so the kitchen layout is not limited later.
How we'd run your project
Look at the house
We start in Pencoed with a free visit: measurements, photos, a look at the loft and drains, and a frank chat about budget.
Drawings and permission
Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Pencoed.
Technical design
We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.
Finish and certify
Second fix, plastering and making good, then building control's final inspection and the completion paperwork.
Questions about kitchen extensions with bedrooms above in Pencoed
How long does a kitchen extension with bedrooms above take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils normally decide householder applications within 8 weeks), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Who handles building regulations for a project in Pencoed?
We handle it as part of the project. What's needed in Wales: building regulations approval under the Welsh Approved Documents, which differ from England's in places (notably energy efficiency). We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Do I need planning permission for a kitchen extension with bedrooms above in Pencoed?
Pencoed is in Wales, so Wales planning rules apply. It may be permitted development if the ground floor goes no more than 4 m and the first floor no more than 3 m beyond the original rear wall, with the first floor 10.5 m from the rear boundary. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.
Is it cheaper to build a kitchen extension and bedrooms at the same time?
Yes, in most cases. Building both floors at once means one set of foundations, one roof, one scaffold and one set of approvals. Adding a first floor later means removing the original roof, possibly strengthening the foundations and disrupting the kitchen again. If you think you will need the bedroom, build it now.
Can the kitchen be bigger than the bedrooms above it?
Yes. With planning permission, the ground floor can extend further than the first floor, giving a part single, part two-storey design. In Wales, permitted development allows the ground floor to go 4 m and the first floor 3 m beyond the original rear wall. We show both options at the design stage.
Nearby
Close to Pencoed? We work across the area, including:
Other extensions in Pencoed
All two-storey extension services in Pencoed · Kitchen extensions with bedrooms above across Mid Glamorgan
Book a free site visit in Pencoed and we'll tell you what's possible, what approvals you need and what the design stage would cost.