Kitchen extensions with bedrooms above in Wiltshire
Looking for kitchen extensions with bedrooms above in Wiltshire? We handle the full job: survey, design, approvals, structural design and build.
Wiltshire at a glance
- Nation
- England
- Price region
- South West England
- Postcode areas
- BA, SN, SP
- Towns covered
- 14 listed below, plus surrounding villages
- Approval route
- It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
- Site visits
- Free, no obligation
What a kitchen extension with bedrooms above involves
This service suits you if your kitchen is too small and you also need another bedroom. Building both floors at once costs less than a single-storey kitchen extension now and a first floor later. You get a layout that works for cooking, eating and the garden, a bedroom plan that works upstairs, the approvals your nation needs and the build, carried out by vetted teams working under S&K. Kitchen units are priced separately.
The main places we list in Wiltshire are Swindon (SN1), Salisbury (SP1), Trowbridge (BA14), Chippenham (SN15), Melksham (SN12) and Warminster (BA12). We cover the villages in between too.
Guide price in South West England
A guide price for Wiltshire: around £57,500–£78,000 (kitchen units and worktops priced separately) for a 4 m × 3.5 m footprint on two floors (28 m² of new floor space). That works out at £2,060–£2,780 per m² of new floor space, including VAT at 20%. Professional fees for drawings and the structural engineer are listed separately on our prices page.
| Spec | Per m² | Typical project |
|---|---|---|
| Essential | £1,900–£2,560 per m² | £53,000–£71,500 |
| Standard | £2,060–£2,780 per m² | £57,500–£78,000 |
| Premium | £2,470–£3,340 per m² | £69,000–£93,500 |
Rules in England
In England, a two-storey rear kitchen extension can be permitted development if it goes no more than 3 m beyond the rear wall of the original house and stays at least 7 m from the rear boundary, with matching materials and roof pitch, outside protected areas. No balconies are allowed. Deeper designs need planning permission, costing £548 (or £575 for applications made from 8 December 2026).
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.
Getting the design right
Glazing and the Part L 25% rule
In England, new windows, roof lights and glazed doors in an extension are normally limited to 25% of the extension's floor area plus the area of any windows or doors removed. Larger glazing is possible, but needs SAP or compensating calculations, so we plan the rear doors around this from the start.
Bedrooms over a kitchen
Bedrooms above need an escape window or a protected route to the stairs, plus good sound insulation from the kitchen below. We position the stairs, landing and bedroom doors so the new rooms connect naturally to the existing first floor.
How we work in Wiltshire
Start at your house
We come to your home in Wiltshire, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Get it approved
Once you're happy with the design we submit it to the council for Wiltshire and deal with any questions from the planning officer.
Fixed price in writing
With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.
Build and hand over
We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.
Towns we cover in Wiltshire
- Swindon
- Salisbury
- Trowbridge
- Chippenham
- Melksham
- Warminster
- Calne
- Westbury
- Devizes
- Neston (Wiltshire)
- Corsham
- Wootton Bassett
- Amesbury
- Bulford
Kitchen extensions with bedrooms above in Wiltshire: questions
How much does a kitchen extension with bedrooms above cost in Wiltshire?
In South West England our guide is £2,060–£2,780 per m² including VAT, so about £57,500–£78,000 (kitchen units and worktops priced separately) for a 4 m × 3.5 m footprint on two floors (28 m² of new floor space). Essential and Premium specs move that by roughly 8% down or 20% up.
Is it cheaper to build a kitchen extension and bedrooms at the same time?
Yes, in most cases. Building both floors at once means one set of foundations, one roof, one scaffold and one set of approvals. Adding a first floor later means removing the original roof, possibly strengthening the foundations and disrupting the kitchen again. If you think you will need the bedroom, build it now.
Can I keep using my kitchen during the build?
For part of it. The new structure can be built while your existing kitchen stays in use, but when the rear wall is opened and the new kitchen is fitted there will be several weeks without one. We plan when this happens and help you set up a temporary kitchen elsewhere in the house.
Will I need planning permission in Wiltshire?
Wiltshire is in England. It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
Neighbouring areas
- Kitchen extensions with bedrooms above in Bristol
- Kitchen extensions with bedrooms above in Gloucestershire
- Kitchen extensions with bedrooms above in Somerset
- Kitchen extensions with bedrooms above in Dorset
All extension services in Wiltshire · About kitchen extensions with bedrooms above
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.