Dunfermline · Fife

Part single, part two-storey extensions in Dunfermline

A part single, part two-storey extension is one of the most space-efficient ways to add bedrooms and living space to a house in Dunfermline, because the new floors share one set of foundations and one roof.

Dunfermline: the key facts for this kind of project.

Postcode districts
KY12
County / area
Fife, Scotland
Price region
Scotland
Guide price
£67,500–£93,000 (£1,880–£2,580 per m²)
Approval route
Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
Nearest towns
Rosyth (2.5 miles), Dalgety Bay (4.9 miles), Kelty (5.1 miles)
First visit
Free, no obligation

About a part single, part two-storey extension

A part single, part two-storey extension suits you if you want a generous ground floor but only need one extra room upstairs, or if a full two-storey design would affect a neighbour too much. You get design options that test where the two-storey part works best, the approvals your nation needs, structural design, a building warrant and the build, carried out by vetted teams working under S&K.

We cover postcode district KY12 in and around Dunfermline, along with neighbouring Rosyth, Dalgety Bay and Kelty.

What it costs in Dunfermline

Using our Scotland rates, a part single, part two-storey extension with a 6 m × 4 m ground floor and a first floor over half of it (36 m² in total) comes to about £67,500–£93,000, including VAT. Bigger or more glazed designs cost more per m². Keep a contingency of around 10% for things nobody can see until the ground is opened up.

SpecPer m²A 6 m × 4 m ground floor and a first floor over half of it (36 m² in total)
Essential£1,730–£2,380 per m²£62,500–£85,500
Standard£1,880–£2,580 per m²£67,500–£93,000
Premium£2,260–£3,100 per m²£81,000–£111,500

Planning and building standards in Dunfermline

In Scotland, because part of the extension is more than one storey, it is assessed under Class 1B, which needs at least 10 m to every boundary for permitted development. On most plots that is not possible, so the extension needs a householder application (£371, decided within two months). A building warrant is also needed before any work starts.

Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.

Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.

Design points for Dunfermline homes

The roof junction

Where the single-storey roof meets the two-storey wall you need a sound weathering detail, usually a lead or similar flashing, and enough height for roof lights or a lantern. We set the roof falls and the upstairs window sill heights together so they do not clash.

Where to put the two-storey part

The two-storey section usually works best away from the closest neighbour, with the single-storey part on that boundary side. We test a few positions against neighbours' windows, the upstairs layout and the roof shape before choosing the one to take forward.

How we'd run your project

  1. Free site visit

    We visit your home in Dunfermline, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Drawings and permission

    Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Dunfermline.

  3. Fixed price in writing

    With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.

  4. Build and sign-off

    Vetted teams working under S&K build the extension, and we arrange the completion certificate at the end.

Questions about part single, part two-storey extensions in Dunfermline

How long does a part single, part two-storey extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Which postcodes do you cover around Dunfermline?

We cover Dunfermline (KY12) and nearby places including Rosyth, Dalgety Bay and Kelty, plus the rest of Fife. The first site visit is free.

Do I need planning permission for a part single, part two-storey extension in Dunfermline?

Dunfermline is in Scotland. Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.

Which side should the two-storey part go on?

Usually the side furthest from the nearest neighbour's windows, so the single-storey part sits nearest them and keeps their light. Other factors are where the stairs land upstairs, which room needs the extra space and where drains run. We sketch options at the design stage and explain which is most likely to be approved.

Can the single-storey part be deeper than the two-storey part?

With planning permission, yes, and that is often the point of the design: the ground floor projects further into the garden while the first floor stays back from neighbours. Under permitted development, the depth limits for extensions of more than one storey can apply to the whole extension, so we confirm which route applies before drawings are finalised.

Nearby

We also cover places near Dunfermline, including:

Other extensions in Dunfermline

All two-storey extension services in Dunfermline · Part single, part two-storey extensions across Fife

The quickest next step is a visit. We'll look at your house in Dunfermline and give you an honest view of the options.

CallGuide price