March · Cambridgeshire

Part single, part two-storey extensions in March

For a part single, part two-storey extension in March, the first questions are always the same: how big, which approvals, and what it will cost. This page answers all three for Cambridgeshire.

Quick reference for homeowners in March.

Postcode districts
PE15
County / area
Cambridgeshire, England
Price region
East of England
Guide price
£74,000–£102,000 (£2,060–£2,830 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
Nearest towns
Chatteris (6.7 miles), Wisbech (8.5 miles), Whittlesey (9.2 miles)
Distance to Peterborough
about 14.2 miles
First visit
Free, no obligation

About a part single, part two-storey extension

A part single, part two-storey extension is an extension where the ground floor is wider or deeper than the floor above, so only part of it rises to two storeys. It usually gives a large kitchen or living area with roof lights below and one bedroom or bathroom above. It is often a good way to add space while limiting the effect on neighbours.

Around March we also work in Chatteris, Wisbech and Whittlesey, and across the rest of Cambridgeshire. Postcode district in and near March: PE15.

What it costs in March

Expect a part single, part two-storey extension in March to land somewhere around £74,000–£102,000 for a 6 m × 4 m ground floor and a first floor over half of it (36 m² in total). Our East of England guide rate is £2,060–£2,830 per m², including VAT. Steelwork for wide openings is the item most likely to move the figure; we'll know once the engineer has designed it.

SpecPer m²A 6 m × 4 m ground floor and a first floor over half of it (36 m² in total)
Essential£1,900–£2,610 per m²£68,000–£94,000
Standard£2,060–£2,830 per m²£74,000–£102,000
Premium£2,470–£3,400 per m²£89,000–£122,500

Planning and building regulations in March

In England, the extension can only be permitted development if it goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with matching materials and roof pitch. We check the whole design against the rules, including the 50% garden coverage limit. If any part fails, or extends beyond a side wall on two floors, you need planning permission, costing £548 (or £575 for applications made from 8 December 2026).

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

Design points for March homes

Where to put the two-storey part

The two-storey section usually works best away from the closest neighbour, with the single-storey part on that boundary side. We test a few positions against neighbours' windows, the upstairs layout and the roof shape before choosing the one to take forward.

The roof junction

Where the single-storey roof meets the two-storey wall you need a sound weathering detail, usually a lead or similar flashing, and enough height for roof lights or a lantern. We set the roof falls and the upstairs window sill heights together so they do not clash.

How we'd run your project

  1. Free site visit

    We visit your home in March, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Choose the approval route

    Some designs fit permitted development, most need a householder application. We decide which applies in England before drawing in detail.

  3. Engineer it

    Foundations sized for two floors, steels for any openings, and building control approval, all before anyone starts on site.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Questions about part single, part two-storey extensions in March

Do I need planning permission for a part single, part two-storey extension in March?

March is in England, so England planning rules apply. It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.

How long does a part single, part two-storey extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Who handles building regulations for a project in March?

We handle it as part of the project. What's needed in England: building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Can the single-storey part be deeper than the two-storey part?

With planning permission, yes, and that is often the point of the design: the ground floor projects further into the garden while the first floor stays back from neighbours. Under permitted development, the depth limits for extensions of more than one storey can apply to the whole extension, so we confirm which route applies before drawings are finalised.

Which side should the two-storey part go on?

Usually the side furthest from the nearest neighbour's windows, so the single-storey part sits nearest them and keeps their light. Other factors are where the stairs land upstairs, which room needs the extra space and where drains run. We sketch options at the design stage and explain which is most likely to be approved.

Nearby

The same service in neighbouring towns:

Other extensions in March

All two-storey extension services in March · Part single, part two-storey extensions across Cambridgeshire

Send us your postcode and a few details. We'll get back to you to arrange a visit and talk through your options.

CallGuide price