Newmains · Lanarkshire

Part single, part two-storey extensions in Newmains

We cover Newmains and the rest of Lanarkshire for part single, part two-storey extensions. Start with a free site visit and a plain-English view of what your house and plot can take.

Newmains: the key facts for this kind of project.

Postcode districts
ML2
County / area
Lanarkshire, Scotland
Price region
Scotland
Guide price
£67,500–£93,000 (£1,880–£2,580 per m²)
Approval route
Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
Nearest towns
Wishaw (2.1 miles), Newarthill (3.2 miles), Carluke (3.8 miles)
Distance to East Kilbride
about 11.8 miles
First visit
Free, no obligation

About a part single, part two-storey extension

A part single, part two-storey extension is an extension where the ground floor is wider or deeper than the floor above, so only part of it rises to two storeys. It usually gives a large kitchen or living area with roof lights below and one bedroom or bathroom above. It is often a good way to add space while limiting the effect on neighbours.

We cover postcode district ML2 in and around Newmains, along with neighbouring Wishaw, Newarthill and Carluke.

What it costs in Newmains

In Scotland, which includes Newmains, we'd expect a part single, part two-storey extension to cost around £67,500–£93,000 for a 6 m × 4 m ground floor and a first floor over half of it (36 m² in total), or £1,880–£2,580 per m² including VAT. Kitchens, bathroom fittings and flooring are priced separately so you can compare like with like.

SpecPer m²A 6 m × 4 m ground floor and a first floor over half of it (36 m² in total)
Essential£1,730–£2,380 per m²£62,500–£85,500
Standard£1,880–£2,580 per m²£67,500–£93,000
Premium£2,260–£3,100 per m²£81,000–£111,500

Planning and building standards in Newmains

In Scotland, because part of the extension is more than one storey, it is assessed under Class 1B, which needs at least 10 m to every boundary for permitted development. On most plots that is not possible, so the extension needs a householder application (£371, decided within two months). A building warrant is also needed before any work starts.

Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.

Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.

Design points for Newmains homes

Where to put the two-storey part

The two-storey section usually works best away from the closest neighbour, with the single-storey part on that boundary side. We test a few positions against neighbours' windows, the upstairs layout and the roof shape before choosing the one to take forward.

The roof junction

Where the single-storey roof meets the two-storey wall you need a sound weathering detail, usually a lead or similar flashing, and enough height for roof lights or a lantern. We set the roof falls and the upstairs window sill heights together so they do not clash.

How we'd run your project

  1. Understand the brief

    At your home in Newmains we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.

  2. Drawings, then consent

    We draw the scheme, check it against the rules in Scotland, and take it through the right consent with the council.

  3. Price it properly

    Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.

  4. Build

    Foundations, walls, floor, roof, windows, then first and second fix. We break through into the house as late as we can.

Questions about part single, part two-storey extensions in Newmains

Which postcodes do you cover around Newmains?

We cover Newmains (ML2) and nearby places including Wishaw, Newarthill and Carluke, plus the rest of Lanarkshire. The first site visit is free.

How long does a part single, part two-storey extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Do I need planning permission for a part single, part two-storey extension in Newmains?

Newmains is in Scotland. Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.

Can the single-storey part be deeper than the two-storey part?

With planning permission, yes, and that is often the point of the design: the ground floor projects further into the garden while the first floor stays back from neighbours. Under permitted development, the depth limits for extensions of more than one storey can apply to the whole extension, so we confirm which route applies before drawings are finalised.

Which side should the two-storey part go on?

Usually the side furthest from the nearest neighbour's windows, so the single-storey part sits nearest them and keeps their light. Other factors are where the stairs land upstairs, which room needs the extra space and where drains run. We sketch options at the design stage and explain which is most likely to be approved.

Nearby

Other towns near Newmains:

Other extensions in Newmains

All two-storey extension services in Newmains · Part single, part two-storey extensions across Lanarkshire

Book a free site visit in Newmains and we'll tell you what's possible, what approvals you need and what the design stage would cost.

CallGuide price