Part single, part two-storey extensions in Wokingham
Want to stay in Wokingham but need more space? A part single, part two-storey extension adds floor area on two levels without giving up much garden. Here's what's involved.
The basics for Wokingham at a glance.
- Postcode districts
- RG40 and RG41
- County / area
- Berkshire, England
- Price region
- South East England
- Guide price
- £79,000–£109,000 (£2,200–£3,030 per m²)
- Approval route
- It may be permitted development if it goes no more than 3 m beyond the original rear wall (counting any single-storey part) and stays 7 m from the rear boundary; otherwise it needs planning permission.
- Nearest towns
- Crowthorne (3.4 miles), Bracknell (3.7 miles), Lower Earley (3.8 miles)
- Distance to Reading
- about 6.6 miles
- First visit
- Free, no obligation
About a part single, part two-storey extension
A part single, part two-storey extension is an extension where the ground floor is wider or deeper than the floor above, so only part of it rises to two storeys. It usually gives a large kitchen or living area with roof lights below and one bedroom or bathroom above. It is often a good way to add space while limiting the effect on neighbours.
We cover postcode districts RG40 and RG41 in and around Wokingham, along with neighbouring Crowthorne, Bracknell and Lower Earley.
What it costs in Wokingham
For budgeting in Wokingham, allow around £79,000–£109,000 for a part single, part two-storey extension with a 6 m × 4 m ground floor and a first floor over half of it (36 m² in total). That's based on £2,200–£3,030 per m² including VAT for South East England. The fastest way to a firmer number is a free site visit, after which we price the design stage in writing.
| Spec | Per m² | A 6 m × 4 m ground floor and a first floor over half of it (36 m² in total) |
|---|---|---|
| Essential | £2,020–£2,780 per m² | £73,000–£100,000 |
| Standard | £2,200–£3,030 per m² | £79,000–£109,000 |
| Premium | £2,640–£3,630 per m² | £95,000–£130,500 |
Planning and building regulations in Wokingham
In England, the extension can only be permitted development if it goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with matching materials and roof pitch. We check the whole design against the rules, including the 50% garden coverage limit. If any part fails, or extends beyond a side wall on two floors, you need planning permission, costing £548 (or £575 for applications made from 8 December 2026).
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
Design points for Wokingham homes
Structure at the step
The first-floor wall above often sits over the new open-plan space, so it needs a steel beam or frame to carry it. Loads come down at different points than in a full two-storey design, and the engineer sizes the foundations to suit each part.
Light into the kitchen
The single-storey part is the place for roof lights or a lantern, which bring daylight deep into the plan. In England, glazing is normally limited to 25% of the new floor area plus any windows removed, unless calculations show the house still performs, so we plan the balance early.
How we'd run your project
Start at your house
We come to your home in Wokingham, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Drawings and permission
Our designers produce plans and elevations, then we take care of planning or permitted development checks with the council covering Wokingham.
Technical design
We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.
Build and hand over
We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.
Questions about part single, part two-storey extensions in Wokingham
How much does a part single, part two-storey extension cost in Wokingham?
Our guide for South East England, which covers Wokingham, is £2,200–£3,030 per m² including VAT. A typical project with a 6 m × 4 m ground floor and a first floor over half of it (36 m² in total) comes to about £79,000–£109,000. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.
Who handles building regulations for a project in Wokingham?
We handle it as part of the project. What's needed in England: building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
How long does a part single, part two-storey extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Can I add roof lights to the single-storey part?
Yes. Roof lights or a lantern over the single-storey part are one of the main reasons to choose this design, as they light the middle of a deep kitchen. In England they count towards the Part L glazing allowance, normally 25% of the new floor area plus windows removed, so we balance them with the rear doors.
Which side should the two-storey part go on?
Usually the side furthest from the nearest neighbour's windows, so the single-storey part sits nearest them and keeps their light. Other factors are where the stairs land upstairs, which room needs the extra space and where drains run. We sketch options at the design stage and explain which is most likely to be approved.
Nearby
Close to Wokingham? We work across the area, including:
Other extensions in Wokingham
- Rear
- Side
- Wraparound
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Wokingham · Part single, part two-storey extensions across Berkshire
The quickest next step is a visit. We'll look at your house in Wokingham and give you an honest view of the options.