Planning permission for two-storey extensions in Hampshire
Our planning application service covers the whole of Hampshire. Choose your town below, or get in touch to talk your project through.
Hampshire at a glance
- Nation
- England
- Price region
- South East England
- Postcode areas
- BH, GU, PO, RG, SO, SP
- Towns covered
- 34 listed below, plus surrounding villages
- Site visits
- Free, no obligation
What a planning application involves
This service suits you if you want your two-storey extension to go through planning with the best chance of approval. You get a check of your house's planning history, permitted development rights and local design guidance, a design shaped around them, the application prepared and submitted, and someone to deal with the planning officer's questions. We cannot promise an outcome, but we design to give the application a fair chance.
Hampshire towns we list: Southampton (SO14), Portsmouth (PO1), Basingstoke (RG21), Gosport (PO12), Waterlooville (PO7) and Farnborough (Hampshire) (GU14). Every other address in Hampshire is covered as well.
Fees
Planning drawings are a guide of £2,000–£3,500, priced in writing before the design stage starts. Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026).
Rules in England
In England, a householder planning application costs £548 (or £575 for applications made from 8 December 2026), and councils should decide within 8 weeks of validation. Two-storey side, wraparound and front extensions always need permission. Rear extensions may be permitted development within the 3 m and 7 m limits, confirmed with a lawful development certificate costing £274 (about £288 for applications from 8 December 2026).
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.
Getting the design right
Check the history first
Planning conditions from when the house was built, earlier extensions and Article 4 directions can all remove permitted development rights. We check the council's records and your house's history before design starts, so the route is clear.
Design to local guidance
Most councils publish guidance on extensions covering set-backs, roof heights, boundary gaps and neighbours' light. Designing to it from the start makes approval more likely and reduces the chance of being asked to make changes during the application.
How we work in Hampshire
Start at your house
We come to your home in Hampshire, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Design and approvals
We draw the extension and check it against the rules for England, then apply for planning permission or a certificate of lawfulness, whichever fits.
Engineer it
Foundations sized for two floors, steels for any openings, and building control approval, all before anyone starts on site.
Finish and certify
Second fix, plastering and making good, then building control's final inspection and the completion paperwork.
Towns we cover in Hampshire
- Southampton
- Portsmouth
- Basingstoke
- Gosport
- Waterlooville
- Farnborough (Hampshire)
- Eastleigh
- Winchester
- Havant
- Andover
- Fareham
- Aldershot
- Fleet
- Totton
- New Milton
- Bordon
- Hythe (Hampshire)
- Yateley
- Alton
- Southsea
- Hedge End
- Bishopstoke
- Romsey
- Hayling Island
- Tadley
- South Hayling
- Petersfield
- Lymington
- Portswood
- Ringwood
- Woolston
- Tidworth
- Cosham
- Fair Oak
Planning permission for two-storey extensions in Hampshire: questions
What happens if my planning application is refused?
You can change the design and apply again, or appeal. In England, a householder appeal must usually be made within 12 weeks of the decision. Often the best route is a revised design that answers the reasons for refusal. We read the officer's report and advise which option has the better chance.
Should I get pre-application advice from the council?
It can help on sensitive sites, such as conservation areas, corner plots or front extensions, where the council's view is hard to predict. Many councils charge for it and response times vary. For straightforward designs that follow local guidance, a well prepared application is often the quicker route.
Neighbouring areas
- Planning permission for two-storey extensions in the Isle of Wight
- Planning permission for two-storey extensions in West Sussex
- Planning permission for two-storey extensions in Berkshire
- Planning permission for two-storey extensions in Surrey
All extension services in Hampshire · About planning permission for two-storey extensions
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.