Two-storey rear extensions in Carluke
Thinking about a two-storey rear extension in Carluke? We design it, take it through the approvals it needs and build it, with one team responsible from the first visit to the final certificate.
Carluke: the key facts for this kind of project.
- Postcode districts
- ML8
- County / area
- Lanarkshire, Scotland
- Price region
- Scotland
- Guide price
- £52,500–£71,000 (£1,880–£2,540 per m²)
- Approval route
- Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
- Nearest towns
- Dalserf (3.4 miles), Newmains (3.8 miles), Wishaw (4 miles)
- Distance to East Kilbride
- about 13.6 miles
- First visit
- Free, no obligation
About a two-storey rear extension
A two-storey rear extension suits you if you need more room on both floors and have a reasonably deep garden. You get one team for the whole job: a measured survey, the design, a check on whether permitted development applies, planning drawings where they are needed, structural design, a building warrant and the build itself, carried out by vetted teams working under S&K. Every project starts with a free site visit.
Around Carluke we also work in Dalserf, Newmains and Wishaw, and across the rest of Lanarkshire. Postcode district in and near Carluke: ML8.
What it costs in Carluke
Guide prices for two-storey rear extensions in Scotland are around £1,880–£2,540 per m² of new floor space, including VAT. For a typical project with a 4 m × 3.5 m footprint on two floors (28 m² of new floor space), that's roughly £52,500–£71,000. These are guides, not quotes. Ground conditions, steelwork and access can move the figure either way.
| Spec | Per m² | A 4 m × 3.5 m footprint on two floors (28 m² of new floor space) |
|---|---|---|
| Essential | £1,730–£2,330 per m² | £48,500–£65,500 |
| Standard | £1,880–£2,540 per m² | £52,500–£71,000 |
| Premium | £2,260–£3,050 per m² | £63,000–£85,500 |
Planning and building standards in Carluke
In Scotland, a two-storey rear extension is only permitted development under Class 1B if no part of it is within 10 m of any boundary, it is no higher than the house and the house is not in a conservation area. Most gardens cannot meet the 10 m test, so expect a householder application (£371, decided within two months) and a building warrant before work starts.
Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.
Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.
Design points for Carluke homes
Foundations and drains
Foundations for two storeys carry more load than a single storey and may need to go deeper near trees or on clay. Rear extensions often sit near drains, so we check sewer records early, as building over or near a public sewer may need the water company's agreement.
Depth and neighbours' light
Councils check that a two-storey rear extension does not take too much light or outlook from neighbouring windows, and many use a 45-degree line drawn from the nearest habitable window. We test this at sketch stage, so the depth you are shown is one that can realistically be approved.
How we'd run your project
Understand the brief
At your home in Carluke we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.
Drawings, then consent
We draw the scheme, check it against the rules in Scotland, and take it through the right consent with the council.
Detail and price
Construction drawings, engineer's calculations and building warrant approval, then a written fixed price for the build.
Build and hand over
We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.
Questions about two-storey rear extensions in Carluke
Do I need planning permission for a two-storey rear extension in Carluke?
Carluke is in Scotland. Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
How long does a two-storey rear extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Which postcodes do you cover around Carluke?
We cover Carluke (ML8) and nearby places including Dalserf, Newmains and Wishaw, plus the rest of Lanarkshire. The first site visit is free.
Who handles building standards for a project in Carluke?
We handle it as part of the project. What's needed in Scotland: a building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Will a two-storey rear extension block my neighbour's light?
It can if it is too deep or too close to the boundary, which is why councils look closely at its effect on neighbouring windows and gardens. We test the design against light and outlook early, keep the first floor shorter or set in where needed, and use a hipped roof to reduce bulk on the boundary side.
Nearby
The same service in neighbouring towns:
Other extensions in Carluke
- Side
- Wraparound
- Part two-storey
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Carluke · Two-storey rear extensions across Lanarkshire
Send us your postcode and a few details. We'll get back to you to arrange a visit and talk through your options.