Two-storey side extensions in Ballymena
We cover Ballymena and the rest of County Antrim for two-storey side extensions. Start with a free site visit and a plain-English view of what your house and plot can take.
What we'd confirm first for a project in Ballymena.
- Postcode districts
- BT42, BT43 and BT44
- County / area
- County Antrim, Northern Ireland
- Price region
- Northern Ireland
- Guide price
- £76,000–£101,500 (£1,800–£2,420 per m²)
- Approval route
- Planning permission is needed: permitted development side extensions in Northern Ireland can't be more than 4 m high, which rules out two storeys.
- Nearest towns
- Randalstown (7.9 miles), Antrim (10.4 miles), Ballyclare (13.5 miles)
- Distance to Belfast
- about 23.1 miles
- First visit
- Free, no obligation
About a two-storey side extension
A two-storey side extension is a new two-floor addition built into the space beside your house, often over a driveway or side passage. It typically adds one or two bedrooms upstairs and a utility, study or larger kitchen below, without giving up rear garden.
We cover postcode districts BT42, BT43 and BT44 in and around Ballymena, along with neighbouring Randalstown, Antrim and Ballyclare.
What it costs in Ballymena
Using our Northern Ireland rates, a two-storey side extension with a 3 m × 7 m footprint on two floors (42 m² of new floor space) comes to about £76,000–£101,500, including VAT. Bigger or more glazed designs cost more per m². We'll give you a written design-stage price first, then a fixed build price once the drawings are agreed.
| Spec | Per m² | A 3 m × 7 m footprint on two floors (42 m² of new floor space) |
|---|---|---|
| Essential | £1,660–£2,230 per m² | £69,500–£93,500 |
| Standard | £1,800–£2,420 per m² | £76,000–£101,500 |
| Premium | £2,160–£2,900 per m² | £91,000–£122,000 |
Planning and building control in Ballymena
In Northern Ireland, permitted development for two-storey work is set out for rear extensions, so a two-storey side extension normally needs a planning application. The fee is £347 per dwelling, and councils aim for an average of 15 weeks on local applications. You also need building control approval from the council under the Technical Booklets.
Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.
Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.
Design points for Ballymena homes
Side windows, boundaries and gutters
Upstairs windows in the side wall face the neighbour, so they are usually obscure-glazed and fixed, or left out. Building close to the boundary also raises questions about foundations, overhanging gutters and access for maintenance, so we design the eaves and gutter to stay within your land.
Matching the ridge and roof
A hipped house usually needs a hipped extension roof, and a gabled house a gable. Matching the pitch, tiles, ridge detail and brick bond is what makes a side extension look original rather than added, and councils look closely at it on a front-facing addition.
How we'd run your project
Free site visit
We visit your home in Ballymena, look at the structure, access and boundaries, and talk through what you want the new rooms to do.
Drawings, then consent
We draw the scheme, check it against the rules in Northern Ireland, and take it through the right consent with the council.
Structure and building control
A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.
Build it
The new structure goes up first, then we open into the house, finish inside and get the completion certificate.
Questions about two-storey side extensions in Ballymena
Who handles building control for a project in Ballymena?
We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
How long does a two-storey side extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Do I need planning permission for a two-storey side extension in Ballymena?
Ballymena is in Northern Ireland. Planning permission is needed: permitted development side extensions in Northern Ireland can't be more than 4 m high, which rules out two storeys.
Which postcodes do you cover around Ballymena?
We cover Ballymena (BT42, BT43 and BT44) and nearby places including Randalstown, Antrim and Ballyclare, plus the rest of County Antrim. The first site visit is free.
Can I build a two-storey side extension over my driveway?
Yes, if the drive is wide enough for a useful room and the council accepts the design. You may lose off-road parking, which some councils weigh up, and the foundations need to suit the ground below. We check parking, drains and meter positions at the free site visit before any drawings are prepared.
Nearby
The same service in neighbouring towns:
Other extensions in Ballymena
- Rear
- Wraparound
- Part two-storey
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Ballymena · Two-storey side extensions across County Antrim
The quickest next step is a visit. We'll look at your house in Ballymena and give you an honest view of the options.