Adding a two-storey side extension in Dromore (County Tyrone) gives you two new rooms stacked on one footprint. Here's how we'd approach it, what it typically costs and the rules that apply in Northern Ireland.

The basics for Dromore (County Tyrone) at a glance.

Postcode districts
BT78
County / area
County Tyrone, Northern Ireland
Price region
Northern Ireland
Guide price
£76,000–£101,500 (£1,800–£2,420 per m²)
Approval route
Planning permission is needed: permitted development side extensions in Northern Ireland can't be more than 4 m high, which rules out two storeys.
Nearest towns
Irvinestown (7.7 miles), Omagh (8.7 miles), Ballinamallard (9.3 miles)
Distance to Omagh
about 8.7 miles
First visit
Free, no obligation

About a two-storey side extension

A two-storey side extension is a new two-floor addition built into the space beside your house, often over a driveway or side passage. It typically adds one or two bedrooms upstairs and a utility, study or larger kitchen below, without giving up rear garden.

We cover postcode district BT78 in and around Dromore (County Tyrone), along with neighbouring Irvinestown, Omagh and Ballinamallard.

What it costs in Dromore (County Tyrone)

Using our Northern Ireland rates, a two-storey side extension with a 3 m × 7 m footprint on two floors (42 m² of new floor space) comes to about £76,000–£101,500, including VAT. Bigger or more glazed designs cost more per m². The fastest way to a firmer number is a free site visit, after which we price the design stage in writing.

SpecPer m²A 3 m × 7 m footprint on two floors (42 m² of new floor space)
Essential£1,660–£2,230 per m²£69,500–£93,500
Standard£1,800–£2,420 per m²£76,000–£101,500
Premium£2,160–£2,900 per m²£91,000–£122,000

Planning and building control in Dromore (County Tyrone)

In Northern Ireland, permitted development for two-storey work is set out for rear extensions, so a two-storey side extension normally needs a planning application. The fee is £347 per dwelling, and councils aim for an average of 15 weeks on local applications. You also need building control approval from the council under the Technical Booklets.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Dromore (County Tyrone) homes

Set-down and set-back

Councils usually want a two-storey side extension to look subordinate to the house. Setting the front wall back from the main front and dropping the ridge slightly below the main roof helps it read as an addition, and is often expected in local design guidance.

Matching the ridge and roof

A hipped house usually needs a hipped extension roof, and a gabled house a gable. Matching the pitch, tiles, ridge detail and brick bond is what makes a side extension look original rather than added, and councils look closely at it on a front-facing addition.

How we'd run your project

  1. Free site visit

    We visit your home in Dromore (County Tyrone), look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Dromore (County Tyrone) and deal with any questions from the planning officer.

  3. Price it properly

    Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.

  4. On site

    One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.

Questions about two-storey side extensions in Dromore (County Tyrone)

How long does a two-storey side extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Who handles building control for a project in Dromore (County Tyrone)?

We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

How much does a two-storey side extension cost in Dromore (County Tyrone)?

Our guide for Northern Ireland, which covers Dromore (County Tyrone), is £1,800–£2,420 per m² including VAT. A typical project with a 3 m × 7 m footprint on two floors (42 m² of new floor space) comes to about £76,000–£101,500. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.

Do I need planning permission for a two-storey side extension in Dromore (County Tyrone)?

Dromore (County Tyrone) is in Northern Ireland. Planning permission is needed: permitted development side extensions in Northern Ireland can't be more than 4 m high, which rules out two storeys.

Can I build a two-storey side extension over my driveway?

Yes, if the drive is wide enough for a useful room and the council accepts the design. You may lose off-road parking, which some councils weigh up, and the foundations need to suit the ground below. We check parking, drains and meter positions at the free site visit before any drawings are prepared.

Nearby

We also cover places near Dromore (County Tyrone), including:

Other extensions in Dromore (County Tyrone)

All two-storey extension services in Dromore (County Tyrone) · Two-storey side extensions across County Tyrone

Send us your postcode and a few details. We'll get back to you to arrange a visit and talk through your options.