Dundry · Bristol

Two-storey side extensions in Dundry

Thinking about a two-storey side extension in Dundry? We design it, take it through the approvals it needs and build it, with one team responsible from the first visit to the final certificate.

Dundry: the key facts for this kind of project.

Postcode districts
BS13
County / area
Bristol, England
Price region
South West England
Guide price
£88,500–£119,000 (£2,110–£2,830 per m²)
Approval route
Planning permission is needed: in England, permitted development only allows single-storey extensions to the side.
Nearest towns
Bishopsworth (1.4 miles), Chew Magna (2.6 miles), Whitchurch (Bristol) (3.4 miles)
First visit
Free, no obligation

About a two-storey side extension

A two-storey side extension suits a detached or semi-detached house with a side garden, driveway or garage wide enough to build on. You get a design that sits comfortably on the street, a planning application or permitted development check depending on your nation, structural design, building regulations approval and the build itself. We manage the whole process, and the work is carried out by vetted teams working under S&K.

Around Dundry we also work in Bishopsworth, Chew Magna and Whitchurch (Bristol), and across the rest of Bristol. Postcode district in and near Dundry: BS13.

What it costs in Dundry

Most of the cost of a two-storey side extension is set by its size and specification. For Dundry and the rest of South West England, our guide is £2,110–£2,830 per m² including VAT, so about £88,500–£119,000 for a 3 m × 7 m footprint on two floors (42 m² of new floor space). These are guides, not quotes. Ground conditions, steelwork and access can move the figure either way.

SpecPer m²A 3 m × 7 m footprint on two floors (42 m² of new floor space)
Essential£1,940–£2,610 per m²£81,500–£109,500
Standard£2,110–£2,830 per m²£88,500–£119,000
Premium£2,530–£3,400 per m²£106,500–£143,000

Planning and building regulations in Dundry

In England, a two-storey side extension always needs householder planning permission, because permitted development only allows single-storey extensions beyond a side wall. The fee is £548 (or £575 for applications made from 8 December 2026), and councils should decide within 8 weeks of validation. Expect them to look at set-back, roof height, gaps to the boundary and the effect on neighbours.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

Design points for Dundry homes

Matching the ridge and roof

A hipped house usually needs a hipped extension roof, and a gabled house a gable. Matching the pitch, tiles, ridge detail and brick bond is what makes a side extension look original rather than added, and councils look closely at it on a front-facing addition.

Set-down and set-back

Councils usually want a two-storey side extension to look subordinate to the house. Setting the front wall back from the main front and dropping the ridge slightly below the main roof helps it read as an addition, and is often expected in local design guidance.

How we'd run your project

  1. Measure and listen

    A visit to Dundry to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.

  2. Drawings, then consent

    We draw the scheme, check it against the rules in England, and take it through the right consent with the council.

  3. Technical design

    We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Questions about two-storey side extensions in Dundry

Who handles building regulations for a project in Dundry?

We handle it as part of the project. What's needed in England: building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

How long does a two-storey side extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Do I need planning permission for a two-storey side extension in Dundry?

Dundry is in England, so England planning rules apply. Planning permission is needed: in England, permitted development only allows single-storey extensions to the side. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.

Which postcodes do you cover around Dundry?

We cover Dundry (BS13) and nearby places including Bishopsworth, Chew Magna and Whitchurch (Bristol), plus the rest of Bristol. The first site visit is free.

Can I build a two-storey side extension over my driveway?

Yes, if the drive is wide enough for a useful room and the council accepts the design. You may lose off-road parking, which some councils weigh up, and the foundations need to suit the ground below. We check parking, drains and meter positions at the free site visit before any drawings are prepared.

Nearby

Close to Dundry? We work across the area, including:

Other extensions in Dundry

All two-storey extension services in Dundry · Two-storey side extensions across Bristol

Tell us about your house in Dundry and we'll call you back to arrange a free, no-obligation visit.

CallGuide price