Hampstead · Greater London

Two-storey side extensions in Hampstead

Our two-storey side extensions service in Hampstead covers everything: measured survey, design, planning or permitted development checks, structural design, building control and the build itself.

Hampstead: the key facts for this kind of project.

Postcode districts
NW3
County / area
Greater London, England
Price region
London
Guide price
£103,500–£138,500 (£2,460–£3,300 per m²)
Approval route
Planning permission is needed: in England, permitted development only allows single-storey extensions to the side.
Nearest towns
Belsize Park (0.6 miles), Kilburn (0.6 miles), Highgate (1.1 miles)
First visit
Free, no obligation

About a two-storey side extension

A two-storey side extension suits a detached or semi-detached house with a side garden, driveway or garage wide enough to build on. You get a design that sits comfortably on the street, a planning application or permitted development check depending on your nation, structural design, building regulations approval and the build itself. We manage the whole process, and the work is carried out by vetted teams working under S&K.

We cover postcode district NW3 in and around Hampstead, along with neighbouring Belsize Park, Kilburn and Highgate.

What it costs in Hampstead

Most of the cost of a two-storey side extension is set by its size and specification. For Hampstead and the rest of London, our guide is £2,460–£3,300 per m² including VAT, so about £103,500–£138,500 for a 3 m × 7 m footprint on two floors (42 m² of new floor space). These are guides, not quotes. Ground conditions, steelwork and access can move the figure either way.

SpecPer m²A 3 m × 7 m footprint on two floors (42 m² of new floor space)
Essential£2,260–£3,040 per m²£95,000–£127,500
Standard£2,460–£3,300 per m²£103,500–£138,500
Premium£2,950–£3,960 per m²£124,000–£166,500

Planning and building regulations in Hampstead

In England, a two-storey side extension always needs householder planning permission, because permitted development only allows single-storey extensions beyond a side wall. The fee is £548 (or £575 for applications made from 8 December 2026), and councils should decide within 8 weeks of validation. Expect them to look at set-back, roof height, gaps to the boundary and the effect on neighbours.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

Design points for Hampstead homes

Set-down and set-back

Councils usually want a two-storey side extension to look subordinate to the house. Setting the front wall back from the main front and dropping the ridge slightly below the main roof helps it read as an addition, and is often expected in local design guidance.

Access and services

Side extensions often cover the only route to the back garden, a gas meter, soil pipes or a drain run. We plan bin and bike access, move meters and pipes where needed and check drains early, because these items affect both cost and layout.

How we'd run your project

  1. Look at the house

    We start in Hampstead with a free visit: measurements, photos, a look at the loft and drains, and a frank chat about budget.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Hampstead and deal with any questions from the planning officer.

  3. Detail and price

    Construction drawings, engineer's calculations and building control sign-off, then a written fixed price for the build.

  4. Finish and certify

    Second fix, plastering and making good, then building control's final inspection and the completion paperwork.

Questions about two-storey side extensions in Hampstead

Who handles building regulations for a project in Hampstead?

We handle it as part of the project. What's needed in England: building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Which postcodes do you cover around Hampstead?

We cover Hampstead (NW3) and nearby places including Belsize Park, Kilburn and Highgate, plus the rest of Greater London. The first site visit is free.

Do I need planning permission for a two-storey side extension in Hampstead?

Hampstead is in England, so England planning rules apply. Planning permission is needed: in England, permitted development only allows single-storey extensions to the side. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.

How long does a two-storey side extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Can I build a two-storey side extension over my driveway?

Yes, if the drive is wide enough for a useful room and the council accepts the design. You may lose off-road parking, which some councils weigh up, and the foundations need to suit the ground below. We check parking, drains and meter positions at the free site visit before any drawings are prepared.

Nearby

Other towns near Hampstead:

Other extensions in Hampstead

All two-storey extension services in Hampstead · Two-storey side extensions across Greater London

Tell us about your house in Hampstead and we'll call you back to arrange a free, no-obligation visit.

CallGuide price