Two-storey side extensions in Maldon
Adding a two-storey side extension in Maldon gives you two new rooms stacked on one footprint. Here's how we'd approach it, what it typically costs and the rules that apply in England.
Quick reference for homeowners in Maldon.
- Postcode districts
- CM3 and CM9
- County / area
- Essex, England
- Price region
- East of England
- Guide price
- £88,500–£119,000 (£2,110–£2,830 per m²)
- Approval route
- Planning permission is needed: in England, permitted development only allows single-storey extensions to the side.
- Nearest towns
- Witham (5 miles), Chelmsford (8.8 miles), Rochford (10.4 miles)
- Distance to Southend-on-Sea
- about 13.5 miles
- First visit
- Free, no obligation
About a two-storey side extension
A two-storey side extension is a new two-floor addition built into the space beside your house, often over a driveway or side passage. It typically adds one or two bedrooms upstairs and a utility, study or larger kitchen below, without giving up rear garden.
Maldon sits about 13.5 miles from Southend-on-Sea. Closer to home, Witham is 5.0 miles away and Chelmsford 8.8 miles.
What it costs in Maldon
Guide prices for two-storey side extensions in the East of England are around £2,110–£2,830 per m² of new floor space, including VAT. For a typical project with a 3 m × 7 m footprint on two floors (42 m² of new floor space), that's roughly £88,500–£119,000. These are guides, not quotes. Ground conditions, steelwork and access can move the figure either way.
| Spec | Per m² | A 3 m × 7 m footprint on two floors (42 m² of new floor space) |
|---|---|---|
| Essential | £1,940–£2,610 per m² | £81,500–£109,500 |
| Standard | £2,110–£2,830 per m² | £88,500–£119,000 |
| Premium | £2,530–£3,400 per m² | £106,500–£143,000 |
Planning and building regulations in Maldon
In England, a two-storey side extension always needs householder planning permission, because permitted development only allows single-storey extensions beyond a side wall. The fee is £548 (or £575 for applications made from 8 December 2026), and councils should decide within 8 weeks of validation. Expect them to look at set-back, roof height, gaps to the boundary and the effect on neighbours.
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
Design points for Maldon homes
Avoiding a terracing effect
Where semi-detached houses sit close together, side extensions on neighbouring houses can join up and turn a row of pairs into a terrace. Many councils ask for a gap to the boundary at first floor to stop this, so we check local guidance before fixing the width.
Access and services
Side extensions often cover the only route to the back garden, a gas meter, soil pipes or a drain run. We plan bin and bike access, move meters and pipes where needed and check drains early, because these items affect both cost and layout.
How we'd run your project
Look at the house
We start in Maldon with a free visit: measurements, photos, a look at the loft and drains, and a frank chat about budget.
Get it approved
Once you're happy with the design we submit it to the council for Maldon and deal with any questions from the planning officer.
Structure and building control
A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.
Finish and certify
Second fix, plastering and making good, then building control's final inspection and the completion paperwork.
Questions about two-storey side extensions in Maldon
How long does a two-storey side extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Which postcodes do you cover around Maldon?
We cover Maldon (CM3 and CM9) and nearby places including Witham, Chelmsford and Rochford, plus the rest of Essex. The first site visit is free.
Who handles building regulations for a project in Maldon?
We handle it as part of the project. What's needed in England: building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Do I need planning permission for a two-storey side extension in Maldon?
Maldon is in England, so England planning rules apply. Planning permission is needed: in England, permitted development only allows single-storey extensions to the side. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.
Can I build a two-storey side extension over my driveway?
Yes, if the drive is wide enough for a useful room and the council accepts the design. You may lose off-road parking, which some councils weigh up, and the foundations need to suit the ground below. We check parking, drains and meter positions at the free site visit before any drawings are prepared.
Nearby
Nearby towns we cover for two-storey side extensions:
Other extensions in Maldon
- Rear
- Wraparound
- Part two-storey
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Maldon · Two-storey side extensions across Essex
The quickest next step is a visit. We'll look at your house in Maldon and give you an honest view of the options.