Vale of Leven · Glasgow and Dunbartonshire

Two-storey side extensions in Vale of Leven

If you live in Vale of Leven and need more room without moving, a two-storey side extension is worth a serious look. We handle the drawings, approvals, structure and build.

Useful details for planning a two-storey side extension in Vale of Leven.

Postcode districts
G82
County / area
Glasgow and Dunbartonshire, Scotland
Price region
Scotland
Guide price
£81,000–£108,500 (£1,930–£2,580 per m²)
Approval route
Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
Nearest towns
Bonhill (0.8 miles), Alexandria (1.6 miles), Dumbarton (1.9 miles)
Distance to Glasgow
about 14.5 miles
First visit
Free, no obligation

About a two-storey side extension

A two-storey side extension is a new two-floor addition built into the space beside your house, often over a driveway or side passage. It typically adds one or two bedrooms upstairs and a utility, study or larger kitchen below, without giving up rear garden.

Around Vale of Leven we also work in Bonhill, Alexandria and Dumbarton, and across the rest of Glasgow and Dunbartonshire. Postcode district in and near Vale of Leven: G82.

What it costs in Vale of Leven

Guide prices for two-storey side extensions in Scotland are around £1,930–£2,580 per m² of new floor space, including VAT. For a typical project with a 3 m × 7 m footprint on two floors (42 m² of new floor space), that's roughly £81,000–£108,500. Keep a contingency of around 10% for things nobody can see until the ground is opened up.

SpecPer m²A 3 m × 7 m footprint on two floors (42 m² of new floor space)
Essential£1,770–£2,380 per m²£74,500–£100,000
Standard£1,930–£2,580 per m²£81,000–£108,500
Premium£2,310–£3,100 per m²£97,000–£130,500

Planning and building standards in Vale of Leven

In Scotland, a two-storey side extension is only permitted development under Class 1B if no part is within 10 m of any boundary and it is not on an elevation fronting a road. Side extensions rarely meet this, so plan for a householder application (£371, decided within two months) and a building warrant from the council before work starts.

Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.

Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.

Design points for Vale of Leven homes

Access and services

Side extensions often cover the only route to the back garden, a gas meter, soil pipes or a drain run. We plan bin and bike access, move meters and pipes where needed and check drains early, because these items affect both cost and layout.

Side windows, boundaries and gutters

Upstairs windows in the side wall face the neighbour, so they are usually obscure-glazed and fixed, or left out. Building close to the boundary also raises questions about foundations, overhanging gutters and access for maintenance, so we design the eaves and gutter to stay within your land.

How we'd run your project

  1. Measure and listen

    A visit to Vale of Leven to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.

  2. Choose the approval route

    Some designs fit permitted development, most need a householder application. We decide which applies in Scotland before drawing in detail.

  3. Detail and price

    Construction drawings, engineer's calculations and building warrant approval, then a written fixed price for the build.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Questions about two-storey side extensions in Vale of Leven

Do I need planning permission for a two-storey side extension in Vale of Leven?

Vale of Leven is in Scotland. Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.

Which postcodes do you cover around Vale of Leven?

We cover Vale of Leven (G82) and nearby places including Bonhill, Alexandria and Dumbarton, plus the rest of Glasgow and Dunbartonshire. The first site visit is free.

Who handles building standards for a project in Vale of Leven?

We handle it as part of the project. What's needed in Scotland: a building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

How long does a two-storey side extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Can I build a two-storey side extension over my driveway?

Yes, if the drive is wide enough for a useful room and the council accepts the design. You may lose off-road parking, which some councils weigh up, and the foundations need to suit the ground below. We check parking, drains and meter positions at the free site visit before any drawings are prepared.

Nearby

Other towns near Vale of Leven:

Other extensions in Vale of Leven

All two-storey extension services in Vale of Leven · Two-storey side extensions across Glasgow and Dunbartonshire

Book a free site visit in Vale of Leven and we'll tell you what's possible, what approvals you need and what the design stage would cost.

CallGuide price