Two-storey wraparound extensions in Dundee and Angus
Dundee and Angus has a wide mix of house types, and most can take a well-designed two-storey wraparound extension. Here's what's involved, the rules in Scotland and typical costs.
Dundee and Angus at a glance
- Nation
- Scotland
- Price region
- Scotland
- Postcode areas
- DD
- Towns covered
- 8 listed below, plus surrounding villages
- Approval route
- Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
- Site visits
- Free, no obligation
What a two-storey wraparound extension involves
A two-storey wraparound extension is an L-shaped addition that extends both the side and the rear of your house, on two floors. It gives one of the largest gains in floor space of any extension, typically a big open-plan kitchen and living area below and two or more bedrooms or bathrooms above.
The main places we list in Dundee and Angus are Dundee (DD1), Arbroath (DD11), Forfar (DD8), Carnoustie (DD7), Monifieth (DD5) and Brechin (DD9). We cover the villages in between too.
Guide price in Scotland
Expect a two-storey wraparound extension in Dundee and Angus to land somewhere around £113,000–£155,500 for an L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space). Our Scotland guide rate is £2,020–£2,770 per m², including VAT. Kitchens, bathroom fittings and flooring are priced separately so you can compare like with like.
| Spec | Per m² | Typical project |
|---|---|---|
| Essential | £1,860–£2,550 per m² | £104,000–£143,000 |
| Standard | £2,020–£2,770 per m² | £113,000–£155,500 |
| Premium | £2,430–£3,330 per m² | £136,000–£186,500 |
Rules in Scotland
In Scotland, a two-storey wraparound would need to be at least 10 m from every boundary to be permitted development under Class 1B, and not on an elevation fronting a road. That is rarely possible, so plan for a householder planning application, which costs £371 and is decided within two months, followed by a building warrant before work starts.
Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.
Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.
There is no Party Wall Act in Scotland. Shared walls and boundaries are governed by title deeds and common law, so we speak to neighbours early and record the condition of shared structures.
Getting the design right
Phasing the build
A wraparound touches two sides of the house at once, so the kitchen and often the rear rooms are out of use for part of the build. We plan the sequence so you keep a working kitchen and bathroom for as long as possible, or advise when moving out briefly makes sense.
The corner post
At the outside corner of the L, there is no existing wall to carry the floor above. Opening the ground floor fully usually means a steel frame or a corner post, and the engineer's design sets how slim it can be. We decide early whether you want a clear corner or a visible post.
How we work in Dundee and Angus
Understand the brief
At your home in Dundee and Angus we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.
Drawings, then consent
We draw the scheme, check it against the rules in Scotland, and take it through the right consent with the council.
Detail and price
Construction drawings, engineer's calculations and building warrant approval, then a written fixed price for the build.
On site
One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.
Towns we cover in Dundee and Angus
Two-storey wraparound extensions in Dundee and Angus: questions
How much does a two-storey wraparound extension cost in Dundee and Angus?
In Scotland our guide is £2,020–£2,770 per m² including VAT, so about £113,000–£155,500 for an L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space). Essential and Premium specs move that by roughly 8% down or 20% up.
Is a wraparound extension better than separate side and rear extensions?
Building both at once usually costs less than two separate projects, because you pay for one set-up, one scaffold, one roof junction and one set of approvals. It also lets the layout be designed as a whole. The trade-off is a larger single outlay and a longer build, often 16 to 24 weeks at this size.
How much floor space does a wraparound extension add?
It depends on the width of the side plot and the depth at the rear. Our guide prices are based on a typical wraparound with an L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space). Yours may be larger or smaller, and the measured survey shows what your plot can take.
Does a wraparound extension need steel?
Almost always. Opening the corner of the house and the old rear wall to make one open-plan space means steel beams, and often a steel post or frame at the outside corner. The structural engineer sizes these, and the steel is ordered once the design is fixed, which is one reason a wraparound needs careful sequencing.
Will I need planning permission in Dundee and Angus?
Dundee and Angus is in Scotland. Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
Neighbouring areas
- Two-storey wraparound extensions in Perth and Kinross
- Two-storey wraparound extensions in Fife
- Two-storey wraparound extensions in Edinburgh and the Lothians
- Two-storey wraparound extensions in Aberdeen and Aberdeenshire
All extension services in Dundee and Angus · About two-storey wraparound extensions
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.