Two-storey wraparound extensions in Havant
Homes in Havant with a bit of space to the side or rear can often take a two-storey wraparound extension. We'll tell you honestly whether yours can, and what approvals it needs.
The basics for Havant at a glance.
- Postcode districts
- PO9
- County / area
- Hampshire, England
- Price region
- South East England
- Guide price
- £132,500–£181,500 (£2,360–£3,250 per m²)
- Approval route
- Planning permission is needed: the side part takes it outside permitted development in England.
- Nearest towns
- Emsworth (2.2 miles), Waterlooville (2.6 miles), Cosham (3.5 miles)
- Distance to Southampton
- about 18.5 miles
- First visit
- Free, no obligation
About a two-storey wraparound extension
A two-storey wraparound extension is an L-shaped addition that extends both the side and the rear of your house, on two floors. It gives one of the largest gains in floor space of any extension, typically a big open-plan kitchen and living area below and two or more bedrooms or bathrooms above. In England it needs planning permission, because the side part is more than one storey.
We cover Havant (PO9) and the places around it, including Emsworth (2.2 miles), Waterlooville (2.6 miles) and Cosham.
What it costs in Havant
Most of the cost of a two-storey wraparound extension is set by its size and specification. For Havant and the rest of South East England, our guide is £2,360–£3,250 per m² including VAT, so about £132,500–£181,500 for an L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space). Professional fees for drawings and the structural engineer are listed separately on our prices page.
| Spec | Per m² | An L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space) |
|---|---|---|
| Essential | £2,180–£2,990 per m² | £122,000–£167,000 |
| Standard | £2,360–£3,250 per m² | £132,500–£181,500 |
| Premium | £2,840–£3,890 per m² | £159,000–£218,000 |
Planning and building regulations in Havant
In England, a two-storey wraparound extension needs householder planning permission, because any extension beyond a side wall must be single storey to be permitted development. The application costs £548 (or £575 for applications made from 8 December 2026). Councils weigh the side part against the street scene and the rear part against neighbours' light and outlook, and should decide within 8 weeks of validation.
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
Design points for Havant homes
The corner post
At the outside corner of the L, there is no existing wall to carry the floor above. Opening the ground floor fully usually means a steel frame or a corner post, and the engineer's design sets how slim it can be. We decide early whether you want a clear corner or a visible post.
Phasing the build
A wraparound touches two sides of the house at once, so the kitchen and often the rear rooms are out of use for part of the build. We plan the sequence so you keep a working kitchen and bathroom for as long as possible, or advise when moving out briefly makes sense.
How we'd run your project
Start at your house
We come to your home in Havant, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Choose the approval route
Some designs fit permitted development, most need a householder application. We decide which applies in England before drawing in detail.
Detail and price
Construction drawings, engineer's calculations and building control sign-off, then a written fixed price for the build.
Build it
The new structure goes up first, then we open into the house, finish inside and get the completion certificate.
Questions about two-storey wraparound extensions in Havant
How long does a two-storey wraparound extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Do I need planning permission for a two-storey wraparound extension in Havant?
Havant is in England, so England planning rules apply. Planning permission is needed: the side part takes it outside permitted development in England. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.
Which postcodes do you cover around Havant?
We cover Havant (PO9) and nearby places including Emsworth, Waterlooville and Cosham, plus the rest of Hampshire. The first site visit is free.
Can I stay at home during a wraparound extension?
Many people do, but a wraparound affects two sides of the house and usually the kitchen, so there will be weeks without a full kitchen. We plan a temporary kitchen, keep a route through the house and seal off the work area. For some families, moving out while the rear wall is opened up is easier.
Does a wraparound extension need steel?
Almost always. Opening the corner of the house and the old rear wall to make one open-plan space means steel beams, and often a steel post or frame at the outside corner. The structural engineer sizes these, and the steel is ordered once the design is fixed, which is one reason a wraparound needs careful sequencing.
Nearby
Nearby towns we cover for two-storey wraparound extensions:
Other extensions in Havant
- Rear
- Side
- Part two-storey
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Havant · Two-storey wraparound extensions across Hampshire
Book a free site visit in Havant and we'll tell you what's possible, what approvals you need and what the design stage would cost.