Hebburn · Tyne and Wear

Two-storey wraparound extensions in Hebburn

For a two-storey wraparound extension in Hebburn, the first questions are always the same: how big, which approvals, and what it will cost. This page answers all three for Tyne and Wear.

Quick reference for homeowners in Hebburn.

Postcode districts
NE31
County / area
Tyne and Wear, England
Price region
North East England
Guide price
£108,500–£148,500 (£1,940–£2,660 per m²)
Approval route
Planning permission is needed: the side part takes it outside permitted development in England.
Nearest towns
Jarrow (1.3 miles), Wallsend (1.4 miles), Felling (2.6 miles)
Distance to Newcastle upon Tyne
about 3.9 miles
First visit
Free, no obligation

About a two-storey wraparound extension

A two-storey wraparound extension suits a house with space both beside it and behind it, where you want to transform the layout rather than add a single room. You get one design for the whole L-shape, the planning application, structural design for the corner and the openings into the house, building regulations approval and the build, managed by us and carried out by vetted teams working under S&K.

We cover Hebburn (NE31) and the places around it, including Jarrow (1.3 miles), Wallsend (1.4 miles) and Felling.

What it costs in Hebburn

A guide price for Hebburn: around £108,500–£148,500 for an L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space). That works out at £1,940–£2,660 per m² of new floor space, including VAT at 20%. Steelwork for wide openings is the item most likely to move the figure; we'll know once the engineer has designed it.

SpecPer m²An L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space)
Essential£1,780–£2,440 per m²£99,500–£137,000
Standard£1,940–£2,660 per m²£108,500–£148,500
Premium£2,320–£3,190 per m²£130,000–£178,500

Planning and building regulations in Hebburn

In England, a two-storey wraparound extension needs householder planning permission, because any extension beyond a side wall must be single storey to be permitted development. The application costs £548 (or £575 for applications made from 8 December 2026). Councils weigh the side part against the street scene and the rear part against neighbours' light and outlook, and should decide within 8 weeks of validation.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

Design points for Hebburn homes

Phasing the build

A wraparound touches two sides of the house at once, so the kitchen and often the rear rooms are out of use for part of the build. We plan the sequence so you keep a working kitchen and bathroom for as long as possible, or advise when moving out briefly makes sense.

Daylight to the middle

A deep L-shaped plan can leave the middle of the ground floor dark, because the old rear rooms are now enclosed. We use wide rear openings, a well-placed stair and, where part of the extension is single storey, roof lights, while keeping total glazing within the Part L allowance.

How we'd run your project

  1. Visit and first ideas

    One of our team visits your house in Hebburn, checks the walls, roof and drains, and sketches out options with you.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Hebburn and deal with any questions from the planning officer.

  3. Structure and building control

    A structural engineer sizes the foundations and steels, and we get building regulations approval before work starts.

  4. Build and sign-off

    Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.

Questions about two-storey wraparound extensions in Hebburn

How long does a two-storey wraparound extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Do I need planning permission for a two-storey wraparound extension in Hebburn?

Hebburn is in England, so England planning rules apply. Planning permission is needed: the side part takes it outside permitted development in England. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.

Which postcodes do you cover around Hebburn?

We cover Hebburn (NE31) and nearby places including Jarrow, Wallsend and Felling, plus the rest of Tyne and Wear. The first site visit is free.

Can a wraparound extension be part single, part two-storey?

Yes. Many wraparounds keep the rear part single storey with roof lights over the kitchen and put the two-storey part to the side. This can reduce the effect on neighbours and the cost. We set out both options at the design stage, so you can compare floor space against price before choosing.

Is a wraparound extension better than separate side and rear extensions?

Building both at once usually costs less than two separate projects, because you pay for one set-up, one scaffold, one roof junction and one set of approvals. It also lets the layout be designed as a whole. The trade-off is a larger single outlay and a longer build, often 16 to 24 weeks at this size.

Nearby

Other towns near Hebburn:

Other extensions in Hebburn

All two-storey extension services in Hebburn · Two-storey wraparound extensions across Tyne and Wear

Tell us about your house in Hebburn and we'll call you back to arrange a free, no-obligation visit.

CallGuide price