Two-storey wraparound extensions in Holloway
Our two-storey wraparound extensions service in Holloway covers everything: measured survey, design, planning or permitted development checks, structural design, building control and the build itself.
The basics for Holloway at a glance.
- Postcode districts
- N7
- County / area
- Greater London, England
- Price region
- London
- Guide price
- £144,500–£198,000 (£2,580–£3,540 per m²)
- Approval route
- Planning permission is needed: the side part takes it outside permitted development in England.
- Nearest towns
- Barnsbury (0.9 miles), Highbury (1.1 miles), Archway (1.1 miles)
- First visit
- Free, no obligation
About a two-storey wraparound extension
A two-storey wraparound extension is an L-shaped addition that extends both the side and the rear of your house, on two floors. It gives one of the largest gains in floor space of any extension, typically a big open-plan kitchen and living area below and two or more bedrooms or bathrooms above. In England it needs planning permission, because the side part is more than one storey.
We cover Holloway (N7) and the places around it, including Barnsbury (0.9 miles), Highbury (1.1 miles) and Archway.
What it costs in Holloway
For budgeting in Holloway, allow around £144,500–£198,000 for a two-storey wraparound extension with an L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space). That's based on £2,580–£3,540 per m² including VAT for London. The fastest way to a firmer number is a free site visit, after which we price the design stage in writing.
| Spec | Per m² | An L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space) |
|---|---|---|
| Essential | £2,370–£3,260 per m² | £133,000–£182,500 |
| Standard | £2,580–£3,540 per m² | £144,500–£198,000 |
| Premium | £3,100–£4,250 per m² | £173,500–£238,000 |
Planning and building regulations in Holloway
In England, a two-storey wraparound extension needs householder planning permission, because any extension beyond a side wall must be single storey to be permitted development. The application costs £548 (or £575 for applications made from 8 December 2026). Councils weigh the side part against the street scene and the rear part against neighbours' light and outlook, and should decide within 8 weeks of validation.
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
Design points for Holloway homes
The corner post
At the outside corner of the L, there is no existing wall to carry the floor above. Opening the ground floor fully usually means a steel frame or a corner post, and the engineer's design sets how slim it can be. We decide early whether you want a clear corner or a visible post.
Phasing the build
A wraparound touches two sides of the house at once, so the kitchen and often the rear rooms are out of use for part of the build. We plan the sequence so you keep a working kitchen and bathroom for as long as possible, or advise when moving out briefly makes sense.
How we'd run your project
Look at the house
We start in Holloway with a free visit: measurements, photos, a look at the loft and drains, and a frank chat about budget.
Drawings, then consent
We draw the scheme, check it against the rules in England, and take it through the right consent with the council.
Technical design
We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.
Build and sign-off
Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.
Questions about two-storey wraparound extensions in Holloway
How long does a two-storey wraparound extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Who handles building regulations for a project in Holloway?
We handle it as part of the project. What's needed in England: building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Which postcodes do you cover around Holloway?
We cover Holloway (N7) and nearby places including Barnsbury, Highbury and Archway, plus the rest of Greater London. The first site visit is free.
Can I stay at home during a wraparound extension?
Many people do, but a wraparound affects two sides of the house and usually the kitchen, so there will be weeks without a full kitchen. We plan a temporary kitchen, keep a route through the house and seal off the work area. For some families, moving out while the rear wall is opened up is easier.
Is a wraparound extension better than separate side and rear extensions?
Building both at once usually costs less than two separate projects, because you pay for one set-up, one scaffold, one roof junction and one set of approvals. It also lets the layout be designed as a whole. The trade-off is a larger single outlay and a longer build, often 16 to 24 weeks at this size.
Nearby
Other towns near Holloway:
Other extensions in Holloway
- Rear
- Side
- Part two-storey
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Holloway · Two-storey wraparound extensions across Greater London
Book a free site visit in Holloway and we'll tell you what's possible, what approvals you need and what the design stage would cost.