Two-storey wraparound extensions in Omagh
If you live in Omagh and need more room without moving, a two-storey wraparound extension is worth a serious look. We handle the drawings, approvals, structure and build.
Useful details for planning a two-storey wraparound extension in Omagh.
- Postcode districts
- BT78 and BT79
- County / area
- County Tyrone, Northern Ireland
- Price region
- Northern Ireland
- Guide price
- £106,000–£145,500 (£1,890–£2,600 per m²)
- Approval route
- Planning permission is usually needed.
- Nearest towns
- Dromore (County Tyrone) (8.7 miles), Castlederg (13.9 miles), Sion Mills (14.7 miles)
- First visit
- Free, no obligation
About a two-storey wraparound extension
A two-storey wraparound extension suits a house with space both beside it and behind it, where you want to transform the layout rather than add a single room. You get one design for the whole L-shape, the planning application, structural design for the corner and the openings into the house, building regulations approval and the build, managed by us and carried out by vetted teams working under S&K.
We cover Omagh (BT78 and BT79) and the places around it, including Dromore (County Tyrone) (8.7 miles), Castlederg (13.9 miles) and Sion Mills.
What it costs in Omagh
For budgeting in Omagh, allow around £106,000–£145,500 for a two-storey wraparound extension with an L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space). That's based on £1,890–£2,600 per m² including VAT for Northern Ireland. We'll give you a written design-stage price first, then a fixed build price once the drawings are agreed.
| Spec | Per m² | An L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space) |
|---|---|---|
| Essential | £1,740–£2,390 per m² | £97,500–£133,500 |
| Standard | £1,890–£2,600 per m² | £106,000–£145,500 |
| Premium | £2,270–£3,120 per m² | £127,000–£174,500 |
Planning and building control in Omagh
In Northern Ireland, the permitted development allowance for two-storey extensions covers rear extensions of up to 3 m that stay 7 m from the rear boundary. A wraparound adds a side element on two floors, so it normally needs a planning application. The fee is £347 per dwelling, and councils aim for an average of 15 weeks for local applications.
Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.
Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.
Design points for Omagh homes
Phasing the build
A wraparound touches two sides of the house at once, so the kitchen and often the rear rooms are out of use for part of the build. We plan the sequence so you keep a working kitchen and bathroom for as long as possible, or advise when moving out briefly makes sense.
Two roofs that meet
A wraparound needs the side roof and rear roof to join cleanly, often with a valley or hip where they meet. Getting pitches and ridge heights right keeps rainwater moving and avoids a bulky mass at the back corner, which neighbours and planners notice.
How we'd run your project
Visit and first ideas
One of our team visits your house in Omagh, checks the walls, roof and drains, and sketches out options with you.
Drawings, then consent
We draw the scheme, check it against the rules in Northern Ireland, and take it through the right consent with the council.
Fixed price in writing
With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.
Build and sign-off
Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.
Questions about two-storey wraparound extensions in Omagh
Which postcodes do you cover around Omagh?
We cover Omagh (BT78 and BT79) and nearby places including Dromore (County Tyrone), Castlederg and Sion Mills, plus the rest of County Tyrone. The first site visit is free.
Do I need planning permission for a two-storey wraparound extension in Omagh?
Omagh is in Northern Ireland. Planning permission is usually needed.
How long does a two-storey wraparound extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Is a wraparound extension better than separate side and rear extensions?
Building both at once usually costs less than two separate projects, because you pay for one set-up, one scaffold, one roof junction and one set of approvals. It also lets the layout be designed as a whole. The trade-off is a larger single outlay and a longer build, often 16 to 24 weeks at this size.
Can I stay at home during a wraparound extension?
Many people do, but a wraparound affects two sides of the house and usually the kitchen, so there will be weeks without a full kitchen. We plan a temporary kitchen, keep a route through the house and seal off the work area. For some families, moving out while the rear wall is opened up is easier.
Nearby
Nearby towns we cover for two-storey wraparound extensions:
Other extensions in Omagh
- Rear
- Side
- Part two-storey
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Omagh · Two-storey wraparound extensions across County Tyrone
Send us your postcode and a few details. We'll get back to you to arrange a visit and talk through your options.