Skipton · North Yorkshire

Two-storey wraparound extensions in Skipton

Our two-storey wraparound extensions service in Skipton covers everything: measured survey, design, planning or permitted development checks, structural design, building control and the build itself.

Skipton: the key facts for this kind of project.

Postcode districts
BD23
County / area
North Yorkshire, England
Price region
Yorkshire and the Humber
Guide price
£111,000–£152,000 (£1,980–£2,710 per m²)
Approval route
Planning permission is needed: the side part takes it outside permitted development in England.
Nearest towns
Cross Hills (4 miles), Barnoldswick (7.6 miles), Keighley (7.9 miles)
Distance to York
about 38 miles
First visit
Free, no obligation

About a two-storey wraparound extension

A two-storey wraparound extension is an L-shaped addition that extends both the side and the rear of your house, on two floors. It gives one of the largest gains in floor space of any extension, typically a big open-plan kitchen and living area below and two or more bedrooms or bathrooms above. In England it needs planning permission, because the side part is more than one storey.

Skipton sits about 38.0 miles from York. Closer to home, Cross Hills is 4.0 miles away and Barnoldswick 7.6 miles.

What it costs in Skipton

Guide prices for two-storey wraparound extensions in Yorkshire and the Humber are around £1,980–£2,710 per m² of new floor space, including VAT. For a typical project with an L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space), that's roughly £111,000–£152,000. Professional fees for drawings and the structural engineer are listed separately on our prices page.

SpecPer m²An L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space)
Essential£1,820–£2,500 per m²£102,000–£140,000
Standard£1,980–£2,710 per m²£111,000–£152,000
Premium£2,370–£3,260 per m²£133,000–£182,500

Planning and building regulations in Skipton

In England, a two-storey wraparound extension needs householder planning permission, because any extension beyond a side wall must be single storey to be permitted development. The application costs £548 (or £575 for applications made from 8 December 2026). Councils weigh the side part against the street scene and the rear part against neighbours' light and outlook, and should decide within 8 weeks of validation.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

Design points for Skipton homes

Daylight to the middle

A deep L-shaped plan can leave the middle of the ground floor dark, because the old rear rooms are now enclosed. We use wide rear openings, a well-placed stair and, where part of the extension is single storey, roof lights, while keeping total glazing within the Part L allowance.

Two roofs that meet

A wraparound needs the side roof and rear roof to join cleanly, often with a valley or hip where they meet. Getting pitches and ridge heights right keeps rainwater moving and avoids a bulky mass at the back corner, which neighbours and planners notice.

How we'd run your project

  1. Free site visit

    We visit your home in Skipton, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Skipton and deal with any questions from the planning officer.

  3. Technical design

    We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.

  4. Build and sign-off

    Vetted teams working under S&K build the extension, and we arrange the building control completion certificate at the end.

Questions about two-storey wraparound extensions in Skipton

Do I need planning permission for a two-storey wraparound extension in Skipton?

Skipton is in England, so England planning rules apply. Planning permission is needed: the side part takes it outside permitted development in England. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.

Which postcodes do you cover around Skipton?

We cover Skipton (BD23) and nearby places including Cross Hills, Barnoldswick and Keighley, plus the rest of North Yorkshire. The first site visit is free.

How long does a two-storey wraparound extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils should decide householder applications within 8 weeks of validation), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Can I stay at home during a wraparound extension?

Many people do, but a wraparound affects two sides of the house and usually the kitchen, so there will be weeks without a full kitchen. We plan a temporary kitchen, keep a route through the house and seal off the work area. For some families, moving out while the rear wall is opened up is easier.

Can a wraparound extension be part single, part two-storey?

Yes. Many wraparounds keep the rear part single storey with roof lights over the kitchen and put the two-storey part to the side. This can reduce the effect on neighbours and the cost. We set out both options at the design stage, so you can compare floor space against price before choosing.

Nearby

Close to Skipton? We work across the area, including:

Other extensions in Skipton

All two-storey extension services in Skipton · Two-storey wraparound extensions across North Yorkshire

Ready to talk it through? Call us or send the form and we'll arrange a visit to your home in Skipton.

CallGuide price