Two-storey wraparound extensions in Soham
Thinking about a two-storey wraparound extension in Soham? We design it, take it through the approvals it needs and build it, with one team responsible from the first visit to the final certificate.
Useful details for planning a two-storey wraparound extension in Soham.
- Postcode districts
- CB7
- County / area
- Cambridgeshire, England
- Price region
- East of England
- Guide price
- £124,000–£170,000 (£2,210–£3,040 per m²)
- Approval route
- Planning permission is needed: the side part takes it outside permitted development in England.
- Nearest towns
- Ely (5.4 miles), Newmarket (6.9 miles), Mildenhall (7.4 miles)
- Distance to Peterborough
- about 29.6 miles
- First visit
- Free, no obligation
About a two-storey wraparound extension
A two-storey wraparound extension is an L-shaped addition that extends both the side and the rear of your house, on two floors. It gives one of the largest gains in floor space of any extension, typically a big open-plan kitchen and living area below and two or more bedrooms or bathrooms above. In England it needs planning permission, because the side part is more than one storey.
We cover Soham (CB7) and the places around it, including Ely (5.4 miles), Newmarket (6.9 miles) and Mildenhall.
What it costs in Soham
A guide price for Soham: around £124,000–£170,000 for an L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space). That works out at £2,210–£3,040 per m² of new floor space, including VAT at 20%. Kitchens, bathroom fittings and flooring are priced separately so you can compare like with like.
| Spec | Per m² | An L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space) |
|---|---|---|
| Essential | £2,040–£2,800 per m² | £114,000–£156,500 |
| Standard | £2,210–£3,040 per m² | £124,000–£170,000 |
| Premium | £2,660–£3,650 per m² | £149,000–£204,000 |
Planning and building regulations in Soham
In England, a two-storey wraparound extension needs householder planning permission, because any extension beyond a side wall must be single storey to be permitted development. The application costs £548 (or £575 for applications made from 8 December 2026). Councils weigh the side part against the street scene and the rear part against neighbours' light and outlook, and should decide within 8 weeks of validation.
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
Design points for Soham homes
The corner post
At the outside corner of the L, there is no existing wall to carry the floor above. Opening the ground floor fully usually means a steel frame or a corner post, and the engineer's design sets how slim it can be. We decide early whether you want a clear corner or a visible post.
Two roofs that meet
A wraparound needs the side roof and rear roof to join cleanly, often with a valley or hip where they meet. Getting pitches and ridge heights right keeps rainwater moving and avoids a bulky mass at the back corner, which neighbours and planners notice.
How we'd run your project
Start at your house
We come to your home in Soham, measure up, check the ground floor walls and roof structure, and note anything near the boundaries.
Get it approved
Once you're happy with the design we submit it to the council for Soham and deal with any questions from the planning officer.
Fixed price in writing
With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.
Finish and certify
Second fix, plastering and making good, then building control's final inspection and the completion paperwork.
Questions about two-storey wraparound extensions in Soham
Do I need planning permission for a two-storey wraparound extension in Soham?
Soham is in England, so England planning rules apply. Planning permission is needed: the side part takes it outside permitted development in England. If in doubt, a lawful development certificate or a planning application gives you certainty before you build.
Who handles building regulations for a project in Soham?
We handle it as part of the project. What's needed in England: building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.
Which postcodes do you cover around Soham?
We cover Soham (CB7) and nearby places including Ely, Newmarket and Mildenhall, plus the rest of Cambridgeshire. The first site visit is free.
Can a wraparound extension be part single, part two-storey?
Yes. Many wraparounds keep the rear part single storey with roof lights over the kitchen and put the two-storey part to the side. This can reduce the effect on neighbours and the cost. We set out both options at the design stage, so you can compare floor space against price before choosing.
Is a wraparound extension better than separate side and rear extensions?
Building both at once usually costs less than two separate projects, because you pay for one set-up, one scaffold, one roof junction and one set of approvals. It also lets the layout be designed as a whole. The trade-off is a larger single outlay and a longer build, often 16 to 24 weeks at this size.
Nearby
Close to Soham? We work across the area, including:
Other extensions in Soham
- Rear
- Side
- Part two-storey
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite
All two-storey extension services in Soham · Two-storey wraparound extensions across Cambridgeshire
Book a free site visit in Soham and we'll tell you what's possible, what approvals you need and what the design stage would cost.