Two-storey wraparound extensions in Strathaven
For a two-storey wraparound extension in Strathaven, the first questions are always the same: how big, which approvals, and what it will cost. This page answers all three for Lanarkshire.
Quick reference for homeowners in Strathaven.
- Postcode districts
- ML10
- County / area
- Lanarkshire, Scotland
- Price region
- Scotland
- Guide price
- £113,000–£155,500 (£2,020–£2,770 per m²)
- Approval route
- Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
- Nearest towns
- Stonehouse (3.3 miles), Larkhall (5.5 miles), Hamilton (6.3 miles)
- Distance to East Kilbride
- about 7.4 miles
- First visit
- Free, no obligation
About a two-storey wraparound extension
A two-storey wraparound extension is an L-shaped addition that extends both the side and the rear of your house, on two floors. It gives one of the largest gains in floor space of any extension, typically a big open-plan kitchen and living area below and two or more bedrooms or bathrooms above.
We cover postcode district ML10 in and around Strathaven, along with neighbouring Stonehouse, Larkhall and Hamilton.
What it costs in Strathaven
For budgeting in Strathaven, allow around £113,000–£155,500 for a two-storey wraparound extension with an L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space). That's based on £2,020–£2,770 per m² including VAT for Scotland. Keep a contingency of around 10% for things nobody can see until the ground is opened up.
| Spec | Per m² | An L-shaped footprint of about 28 m² wrapping the side and rear, on two floors (56 m² of new floor space) |
|---|---|---|
| Essential | £1,860–£2,550 per m² | £104,000–£143,000 |
| Standard | £2,020–£2,770 per m² | £113,000–£155,500 |
| Premium | £2,430–£3,330 per m² | £136,000–£186,500 |
Planning and building standards in Strathaven
In Scotland, a two-storey wraparound would need to be at least 10 m from every boundary to be permitted development under Class 1B, and not on an elevation fronting a road. That is rarely possible, so plan for a householder planning application, which costs £371 and is decided within two months, followed by a building warrant before work starts.
Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.
Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.
Design points for Strathaven homes
The corner post
At the outside corner of the L, there is no existing wall to carry the floor above. Opening the ground floor fully usually means a steel frame or a corner post, and the engineer's design sets how slim it can be. We decide early whether you want a clear corner or a visible post.
Phasing the build
A wraparound touches two sides of the house at once, so the kitchen and often the rear rooms are out of use for part of the build. We plan the sequence so you keep a working kitchen and bathroom for as long as possible, or advise when moving out briefly makes sense.
How we'd run your project
Measure and listen
A visit to Strathaven to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.
Plans, then approval
Measured survey, design, then the right approval route for your house. We explain each step before we take it.
Engineer it
Foundations sized for two floors, steels for any openings, and a building warrant, all before anyone starts on site.
Build
Foundations, walls, floor, roof, windows, then first and second fix. We break through into the house as late as we can.
Questions about two-storey wraparound extensions in Strathaven
How long does a two-storey wraparound extension take?
Allow 4 to 8 weeks for survey and design, then the approval period (councils have two months to decide a local planning application), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.
Which postcodes do you cover around Strathaven?
We cover Strathaven (ML10) and nearby places including Stonehouse, Larkhall and Hamilton, plus the rest of Lanarkshire. The first site visit is free.
Do I need planning permission for a two-storey wraparound extension in Strathaven?
Strathaven is in Scotland. Planning permission is usually needed: Class 1B permitted development only applies if every part of the extension is at least 10 m from all boundaries. A building warrant is needed before work starts.
Can I stay at home during a wraparound extension?
Many people do, but a wraparound affects two sides of the house and usually the kitchen, so there will be weeks without a full kitchen. We plan a temporary kitchen, keep a route through the house and seal off the work area. For some families, moving out while the rear wall is opened up is easier.
Can a wraparound extension be part single, part two-storey?
Yes. Many wraparounds keep the rear part single storey with roof lights over the kitchen and put the two-storey part to the side. This can reduce the effect on neighbours and the cost. We set out both options at the design stage, so you can compare floor space against price before choosing.
Nearby
Other towns near Strathaven:
Other extensions in Strathaven
- Rear
- Side
- Part two-storey
- Over a garage
- First floor
- Semi-detached
- Detached
- Kitchen and bedrooms
- Bedroom and en-suite