Building regulations for two-storey extensions in Merseyside
Planning an extension in Merseyside? This is how our building regulations service works, with the England rules and typical fees.
Merseyside at a glance
- Nation
- England
- Price region
- North West England
- Postcode areas
- CH, L, PR, WA
- Towns covered
- 42 listed below, plus surrounding villages
- Site visits
- Free, no obligation
What a building regulations application involves
This service suits every two-storey extension, because each one needs building regulations approval wherever you live in the UK. You get technical drawings and a specification coordinated with the structural engineer, a full plans application, site inspections arranged at each stage, and the completion certificate you will need when you sell. We manage the process, and the work is carried out by vetted teams working under S&K.
Across Merseyside we cover Liverpool (L1), Birkenhead (CH41), St Helens (WA9), Southport (PR8), Wallasey (CH44) and Bootle (L22), plus the smaller places around them.
Fees
Technical drawings and specification are a guide of £1,500–£4,000. The council's building control fee depends on the value of the work; we confirm every fee in writing before the design stage starts.
Rules in England
In England, building regulations approval comes from council building control or a registered building control approver, using the Approved Documents. Full plans are recommended for two-storey work. New editions of Approved Documents L and F take effect generally from 24 March 2027 and are not yet in force, so current projects follow the 2021 standards.
Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.
Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.
The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.
Getting the design right
Dutyholders in England
Since October 2023, where more than one contractor is involved, a principal designer and principal contractor must be appointed. For domestic clients these duties normally pass to the contractor and designer, so on our projects we take them on.
Full plans and inspections
Full plans approval checks the design before work starts, which we recommend for two-storey extensions. Building control then inspects key stages, such as foundations, damp-proofing, drainage and insulation, before issuing the completion certificate.
How we work in Merseyside
Visit and first ideas
One of our team visits your house in Merseyside, checks the walls, roof and drains, and sketches out options with you.
Drawings, then consent
We draw the scheme, check it against the rules in England, and take it through the right consent with the council.
Price it properly
Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.
Build it
The new structure goes up first, then we open into the house, finish inside and get the completion certificate.
Towns we cover in Merseyside
- Liverpool
- Birkenhead
- St Helens
- Southport
- Wallasey
- Bootle
- Bebington
- Huyton
- Kirkby
- Prescot
- Heswall
- Maghull
- Newton-le-Willows
- Golborne
- Formby
- Litherland
- Speke
- Garston
- Halewood
- Norris Green
- Kirkdale
- Moreton
- Haydock
- Kensington
- Fazakerley
- Hunts Cross
- Belle Vale
- Old Swan
- Allerton
- Bromborough
- Croxteth
- Prenton
- Knotty Ash
- Wavertree
- West Derby
- Childwall
- Whiston
- Dingle
- Woolton
- Mossley Hill
- Rainhill
- Greasby
Building regulations for two-storey extensions in Merseyside: questions
What is a build-over agreement?
A build-over agreement is permission from your water company to build over or near a public sewer. Many rear extensions sit near shared drains, and the water company will want access protected and the pipe checked. We check sewer records early so the agreement does not delay the start.
Do I need building regulations if I have planning permission?
Yes. Planning permission and building regulations are separate. Planning covers what the extension looks like and how it affects neighbours; building regulations cover how it is built and whether it is safe, warm and healthy. A two-storey extension needs both, unless permitted development replaces the planning part.
Are the new 2027 building regulations going to affect my extension?
New editions of Approved Documents L and F take effect generally from 24 March 2027 in England, and are not in force yet. Projects approved under the current rules follow the 2021 standards. If your build will start after that date, we check whether transitional arrangements apply.
Neighbouring areas
- Building regulations for two-storey extensions in Cheshire
- Building regulations for two-storey extensions in Clwyd
- Building regulations for two-storey extensions in Greater Manchester
- Building regulations for two-storey extensions in Lancashire
All extension services in Merseyside · About building regulations for two-storey extensions
Ready to see what a second storey could do for your home?
Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.