Perth and Kinross · Scotland

Building regulations for two-storey extensions in Perth and Kinross

Our building standards service covers the whole of Perth and Kinross. Choose your town below, or get in touch to talk your project through.

Perth and Kinross at a glance

Nation
Scotland
Price region
Scotland
Postcode areas
KY, PH
Towns covered
8 listed below, plus surrounding villages
Site visits
Free, no obligation

What a building warrant application involves

A building warrant for a two-storey extension involves preparing technical drawings and a specification that show how the extension meets the rules on structure, fire safety, insulation, ventilation, electrics and drainage, getting them approved and having the work inspected. At the end you receive a completion certificate.

The main places we list in Perth and Kinross are Perth (PH1), Blairgowrie and Rattray (PH10), Crieff (PH5), Auchterarder (PH3), Scone (PH2) and Kinross (KY13). We cover the villages in between too.

Fees

Technical drawings and specification are a guide of £1,500–£4,000. The council's building warrant fee depends on the value of the work; we confirm every fee in writing before the design stage starts.

Rules in Scotland

In Scotland, you need a building warrant from the council's building standards service before work starts, assessed against the Scottish Building Standards Technical Handbooks rather than Approved Documents. At the end you submit a completion certificate, which the council accepts after its checks. No work should start until the warrant is granted.

Approval in Scotland: Householder planning application: £371. Councils have two months to decide a local planning application.

Building standards: A building warrant from the council's building standards service before work starts, and a completion certificate at the end. Scotland uses its own Technical Handbooks.

There is no Party Wall Act in Scotland. Shared walls and boundaries are governed by title deeds and common law, so we speak to neighbours early and record the condition of shared structures.

Getting the design right

Full plans and inspections

Full plans approval checks the design before work starts, which we recommend for two-storey extensions. Building standards then inspects key stages, such as foundations, damp-proofing, drainage and insulation, before issuing the completion certificate.

How we work in Perth and Kinross

  1. Measure and listen

    A visit to Perth and Kinross to understand how you live in the house now and what the extra rooms need to do, plus a first look at the structure.

  2. Choose the approval route

    Some designs fit permitted development, most need a householder application. We decide which applies in Scotland before drawing in detail.

  3. Fixed price in writing

    With approved drawings and calculations, we give you a fixed build price and a programme you can plan around.

  4. Build

    Foundations, walls, floor, roof, windows, then first and second fix. We break through into the house as late as we can.

Towns we cover in Perth and Kinross

Building regulations for two-storey extensions in Perth and Kinross: questions

Do I need building standards if I have planning permission?

Yes. Planning permission and building standards are separate. Planning covers what the extension looks like and how it affects neighbours; building standards cover how it is built and whether it is safe, warm and healthy. A two-storey extension needs both, unless permitted development replaces the planning part.

What is a completion certificate and why do I need one?

A completion certificate is the document from building standards confirming that the work met the regulations. A buyer's solicitor will ask for it when you sell, and missing certificates can delay a sale. In Scotland, the council accepts your completion certificate after its own checks.

Is a building notice or full plans better for a two-storey extension?

Full plans is better for most two-storey extensions. The design is checked and approved before work starts, so problems with structure or fire escape are found on paper rather than on site. A building notice relies on inspections during the build and suits only simple work. Scotland always needs a building warrant.

Neighbouring areas

All extension services in Perth and Kinross · About building regulations for two-storey extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price