Warwickshire · England

Building regulations for two-storey extensions in Warwickshire

Planning an extension in Warwickshire? This is how our building regulations service works, with the England rules and typical fees.

Warwickshire at a glance

Nation
England
Price region
West Midlands
Postcode areas
B, CV
Towns covered
10 listed below, plus surrounding villages
Site visits
Free, no obligation

What a building regulations application involves

Building regulations approval for a two-storey extension involves preparing technical drawings and a specification that show how the extension meets the rules on structure, fire safety, insulation, ventilation, electrics and drainage, getting them approved and having the work inspected. At the end you receive a completion certificate.

Towns in Warwickshire include Nuneaton (CV10), Rugby (CV21), Leamington Spa (CV31), Warwick (CV34), Bedworth (CV12) and Stratford-upon-Avon (B49). If yours isn't listed, we still cover it.

Fees

Technical drawings and specification are a guide of £1,500–£4,000. The council's building control fee depends on the value of the work; we confirm every fee in writing before the design stage starts.

Rules in England

In England, building regulations approval comes from council building control or a registered building control approver, using the Approved Documents. Full plans are recommended for two-storey work. New editions of Approved Documents L and F take effect generally from 24 March 2027 and are not yet in force, so current projects follow the 2021 standards.

Approval in England: Householder planning application: £548 (or £575 for applications made from 8 December 2026). Lawful development certificate: £274 (about £288 for applications from 8 December 2026). Councils should decide householder applications within 8 weeks of validation.

Building regulations: Building regulations approval (full plans recommended) from the council or a registered building control approver, with a completion certificate at the end.

The Party Wall etc. Act 1996 applies, so notices may be needed for work on or near a shared wall or boundary.

Getting the design right

Fire escape from the first floor

In England, first-floor habitable rooms need an escape window, with a clear opening of at least 0.33 m², at least 450 mm wide and high and its bottom no more than 1,100 mm above the floor, or a protected stair. Adding a storey above 4.5 m means a protected stairway or an alternative.

Insulation and U-values

In England, Part L sets limiting U-values for extensions: 0.18 W/m²K for walls, 0.15 for roofs, 0.18 for floors and 1.4 for windows. Glazing is normally limited to 25% of the new floor area plus windows removed, unless SAP or compensating calculations are used.

How we work in Warwickshire

  1. Understand the brief

    At your home in Warwickshire we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.

  2. Get it approved

    Once you're happy with the design we submit it to the council for Warwickshire and deal with any questions from the planning officer.

  3. Technical design

    We prepare the building regulations drawings, structural calculations and specification so the build price can be fixed.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Towns we cover in Warwickshire

Building regulations for two-storey extensions in Warwickshire: questions

What is a build-over agreement?

A build-over agreement is permission from your water company to build over or near a public sewer. Many rear extensions sit near shared drains, and the water company will want access protected and the pipe checked. We check sewer records early so the agreement does not delay the start.

Do I need building regulations if I have planning permission?

Yes. Planning permission and building regulations are separate. Planning covers what the extension looks like and how it affects neighbours; building regulations cover how it is built and whether it is safe, warm and healthy. A two-storey extension needs both, unless permitted development replaces the planning part.

Are the new 2027 building regulations going to affect my extension?

New editions of Approved Documents L and F take effect generally from 24 March 2027 in England, and are not in force yet. Projects approved under the current rules follow the 2021 standards. If your build will start after that date, we check whether transitional arrangements apply.

Neighbouring areas

All extension services in Warwickshire · About building regulations for two-storey extensions

Ready to see what a second storey could do for your home?

Book a free site visit. We'll look at your house, talk through options and explain the approvals you'd need, then price the design stage in writing.

CallGuide price