Moira · County Armagh

Two-storey extensions for detached houses in Moira

Our two-storey extensions for detached houses service in Moira covers everything: measured survey, design, planning or permitted development checks, structural design, building control and the build itself.

What we'd confirm first for a project in Moira.

Postcode districts
BT67
County / area
County Armagh, Northern Ireland
Price region
Northern Ireland
Guide price
£76,000–£101,500 (£1,800–£2,420 per m²)
Approval route
Depends on position: a two-storey rear extension may be permitted development (3 m deep, 7 m from the rear boundary); most others need planning permission.
Nearest towns
Waringstown (4.3 miles), Donaghcloney (4.4 miles), Dromore (County Down) (5.6 miles)
Distance to Craigavon
about 6.8 miles
First visit
Free, no obligation

About a two-storey extension for a detached house

This service suits you if you own a detached house and want a substantial amount of extra space, whether a side extension over a drive, a rear extension into the garden or a wraparound. You get a survey of the whole plot, options that compare layouts and costs, the approvals your nation needs, structural design and the build, carried out by vetted teams working under S&K.

We cover postcode district BT67 in and around Moira, along with neighbouring Waringstown, Donaghcloney and Dromore (County Down).

What it costs in Moira

Most of the cost of a two-storey extension for a detached house is set by its size and specification. For Moira and the rest of Northern Ireland, our guide is £1,800–£2,420 per m² including VAT, so about £76,000–£101,500 for a 3 m × 7 m footprint on two floors (42 m² of new floor space). Keep a contingency of around 10% for things nobody can see until the ground is opened up.

SpecPer m²A 3 m × 7 m footprint on two floors (42 m² of new floor space)
Essential£1,660–£2,230 per m²£69,500–£93,500
Standard£1,800–£2,420 per m²£76,000–£101,500
Premium£2,160–£2,900 per m²£91,000–£122,000

Planning and building control in Moira

In Northern Ireland, a two-storey rear extension on a detached house can be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary, with height, materials and roof pitch conditions. Side and wraparound designs normally need a planning application, which costs £347 per dwelling.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Moira homes

Choosing the best side

On a detached house you can often extend on either side or the rear. We look at orientation for daylight, where the stairs and landing are, the distance to each boundary, drains and trees, so the extension goes where it adds the most useful space.

Keeping it subordinate

Large detached houses can take a large extension, but councils still expect it to look secondary to the main house. A lower ridge, a modest set-back at the front and matching materials keep the proportions right, even on a wide plot.

How we'd run your project

  1. Understand the brief

    At your home in Moira we agree what you need: bedroom count, bathroom, kitchen space, and how much garden you want to keep.

  2. Choose the approval route

    Some designs fit permitted development, most need a householder application. We decide which applies in Northern Ireland before drawing in detail.

  3. Price it properly

    Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.

  4. On site

    One project lead runs the job, keeps you updated and arranges inspections at each stage until completion.

Questions about two-storey extensions for detached houses in Moira

Who handles building control for a project in Moira?

We handle it as part of the project. What's needed in Northern Ireland: building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets. We prepare the drawings and the engineer's calculations, book the inspections and pass you the completion paperwork at the end.

Which postcodes do you cover around Moira?

We cover Moira (BT67) and nearby places including Waringstown, Donaghcloney and Dromore (County Down), plus the rest of County Armagh. The first site visit is free.

How long does a two-storey extension for a detached house take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Can I extend a detached house on both sides?

Sometimes. With planning permission, a council may accept extensions on both sides if the house stays well proportioned and keeps gaps to the boundaries. It is more common to extend on one side and the rear, or with a wraparound. We look at the plot as a whole before suggesting more than one extension.

Is a detached house extension a better investment than moving?

It often costs less than the gap between your house and a larger one nearby, once property tax, legal fees and removal costs are counted, but that depends on your area. Extending also has limits: every street has a ceiling price. We give you build costs so you can compare them with local asking prices.

Nearby

We also cover places near Moira, including:

Other extensions in Moira

All two-storey extension services in Moira · Two-storey extensions for detached houses across County Armagh

Book a free site visit in Moira and we'll tell you what's possible, what approvals you need and what the design stage would cost.

CallGuide price