If you live in Comber and need more room without moving, an extension over a garage is worth a serious look. We handle the drawings, approvals, structure and build.

Before you start in Comber, here's what applies.

Postcode districts
BT23
County / area
County Down, Northern Ireland
Price region
Northern Ireland
Guide price
£27,500–£40,500 (£1,540–£2,240 per m²)
Approval route
Planning permission is needed: permitted development side extensions in Northern Ireland can't be more than 4 m high, which rules out two storeys.
Nearest towns
Newtownards (3.7 miles), Dundonald (3.7 miles), Castlereagh (5.9 miles)
Distance to Bangor (County Down)
about 8.3 miles
First visit
Free, no obligation

About an extension over a garage

An extension over a garage suits you if you have an attached single garage beside the house and need an extra bedroom or a larger main bedroom with an en-suite. You get an inspection of the garage structure, a design that matches the house, the approvals your nation needs, structural design, building regulations approval and the build, carried out by vetted teams working under S&K.

Comber sits about 8.3 miles from Bangor (County Down). Closer to home, Newtownards is 3.7 miles away and Dundonald 3.7 miles.

What it costs in Comber

For budgeting in Comber, allow around £27,500–£40,500 for an extension over a garage with 3 m × 6 m of new first-floor space (18 m²). That's based on £1,540–£2,240 per m² including VAT for Northern Ireland. The fastest way to a firmer number is a free site visit, after which we price the design stage in writing.

SpecPer m²3 m × 6 m of new first-floor space (18 m²)
Essential£1,420–£2,060 per m²£25,500–£37,000
Standard£1,540–£2,240 per m²£27,500–£40,500
Premium£1,850–£2,690 per m²£33,500–£48,500

Planning and building control in Comber

In Northern Ireland, permitted development for two-storey work is set out for rear extensions, so building over a side garage normally needs a planning application, which costs £347 per dwelling. Councils aim for an average of 15 weeks for local applications. Building control approval is also needed, including fire separation if the garage stays in use.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Comber homes

Fire separation

If the garage stays a garage, the floor between it and the room above, and any door into the house, must give fire separation under building regulations. That usually means fire-resisting plasterboard ceilings, sealed gaps and a fire door, which we design in from the start.

Checking the garage foundations

Garages are often built on shallow strip footings sized for a single-storey wall and a light roof. A trial hole shows their depth and condition, and the engineer decides whether they can carry two storeys or need underpinning or new foundations inside the garage.

How we'd run your project

  1. Free site visit

    We visit your home in Comber, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Plans, then approval

    Measured survey, design, then the right approval route for your house. We explain each step before we take it.

  3. Engineer it

    Foundations sized for two floors, steels for any openings, and building control approval, all before anyone starts on site.

  4. Build and hand over

    We manage the build from groundworks to decoration-ready finish and hand over with the completion paperwork.

Questions about extensions over a garage in Comber

Do I need planning permission for an extension over a garage in Comber?

Comber is in Northern Ireland. Planning permission is needed: permitted development side extensions in Northern Ireland can't be more than 4 m high, which rules out two storeys.

How much does an extension over a garage cost in Comber?

Our guide for Northern Ireland, which covers Comber, is £1,540–£2,240 per m² including VAT. A typical project with 3 m × 6 m of new first-floor space (18 m²) comes to about £27,500–£40,500. Design and approval fees are extra, and we fix the build price in writing once the design is agreed.

How long does an extension over a garage take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Do I need to convert the garage as well?

No. You can keep the garage for parking or storage and build only the room above, as long as the floor between them and any door into the house meet fire separation rules. Converting the garage at the same time is often good value, because the walls and foundations may be upgraded anyway.

How do I get into a room over the garage?

Usually through a new opening off the existing landing or a bedroom, so the stairs stay where they are. If the floor levels do not match, a step or two may be needed inside the new room. Where a landing opening is not practical, a new stair from a converted garage is an option.

Nearby

We also cover places near Comber, including:

Other extensions in Comber

All two-storey extension services in Comber · Extensions over a garage across County Down

Book a free site visit in Comber and we'll tell you what's possible, what approvals you need and what the design stage would cost.

CallGuide price