Comber · County Down

Part single, part two-storey extensions in Comber

If you live in Comber and need more room without moving, a part single, part two-storey extension is worth a serious look. We handle the drawings, approvals, structure and build.

Quick reference for homeowners in Comber.

Postcode districts
BT23
County / area
County Down, Northern Ireland
Price region
Northern Ireland
Guide price
£63,500–£87,000 (£1,760–£2,420 per m²)
Approval route
It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.
Nearest towns
Newtownards (3.7 miles), Dundonald (3.7 miles), Castlereagh (5.9 miles)
Distance to Bangor (County Down)
about 8.3 miles
First visit
Free, no obligation

About a part single, part two-storey extension

A part single, part two-storey extension suits you if you want a generous ground floor but only need one extra room upstairs, or if a full two-storey design would affect a neighbour too much. You get design options that test where the two-storey part works best, the approvals your nation needs, structural design, building regulations approval and the build, carried out by vetted teams working under S&K.

We cover postcode district BT23 in and around Comber, along with neighbouring Newtownards, Dundonald and Castlereagh.

What it costs in Comber

Most of the cost of a part single, part two-storey extension is set by its size and specification. For Comber and the rest of Northern Ireland, our guide is £1,760–£2,420 per m² including VAT, so about £63,500–£87,000 for a 6 m × 4 m ground floor and a first floor over half of it (36 m² in total). The fastest way to a firmer number is a free site visit, after which we price the design stage in writing.

SpecPer m²A 6 m × 4 m ground floor and a first floor over half of it (36 m² in total)
Essential£1,620–£2,230 per m²£58,500–£80,000
Standard£1,760–£2,420 per m²£63,500–£87,000
Premium£2,110–£2,900 per m²£76,000–£104,500

Planning and building control in Comber

In Northern Ireland, the extension can be permitted development if it goes no more than 3 m beyond the original rear wall and stays at least 7 m from the rear boundary, with height, materials and roof pitch conditions met. Specified protected areas are excluded. If the design goes further, a planning application costs £347 per dwelling, and building control approval is needed either way.

Approval in Northern Ireland: Planning application for works to a house: £347. Councils aim to decide local applications within an average of 15 weeks; many take longer.

Building control: Building control approval from the local council under the Building Regulations (Northern Ireland), using the Technical Booklets.

Design points for Comber homes

The roof junction

Where the single-storey roof meets the two-storey wall you need a sound weathering detail, usually a lead or similar flashing, and enough height for roof lights or a lantern. We set the roof falls and the upstairs window sill heights together so they do not clash.

Structure at the step

The first-floor wall above often sits over the new open-plan space, so it needs a steel beam or frame to carry it. Loads come down at different points than in a full two-storey design, and the engineer sizes the foundations to suit each part.

How we'd run your project

  1. Free site visit

    We visit your home in Comber, look at the structure, access and boundaries, and talk through what you want the new rooms to do.

  2. Choose the approval route

    Some designs fit permitted development, most need a householder application. We decide which applies in Northern Ireland before drawing in detail.

  3. Price it properly

    Once the engineer's calculations are in, we fix the build price in writing, with a clear list of what's included.

  4. Build it

    The new structure goes up first, then we open into the house, finish inside and get the completion certificate.

Questions about part single, part two-storey extensions in Comber

Do I need planning permission for a part single, part two-storey extension in Comber?

Comber is in Northern Ireland. It may be permitted development if it goes no more than 3 m beyond the original rear wall and stays 7 m from the rear boundary.

How long does a part single, part two-storey extension take?

Allow 4 to 8 weeks for survey and design, then the approval period (councils aim to decide local applications within an average of 15 weeks; many take longer), then 4 to 8 weeks of technical design, which can overlap. The build itself usually takes 14 to 20 weeks, longer for large or complex designs.

Which postcodes do you cover around Comber?

We cover Comber (BT23) and nearby places including Newtownards, Dundonald and Castlereagh, plus the rest of County Down. The first site visit is free.

Can the single-storey part be deeper than the two-storey part?

With planning permission, yes, and that is often the point of the design: the ground floor projects further into the garden while the first floor stays back from neighbours. Under permitted development, the depth limits for extensions of more than one storey can apply to the whole extension, so we confirm which route applies before drawings are finalised.

Which side should the two-storey part go on?

Usually the side furthest from the nearest neighbour's windows, so the single-storey part sits nearest them and keeps their light. Other factors are where the stairs land upstairs, which room needs the extra space and where drains run. We sketch options at the design stage and explain which is most likely to be approved.

Nearby

Nearby towns we cover for part single, part two-storey extensions:

Other extensions in Comber

All two-storey extension services in Comber · Part single, part two-storey extensions across County Down

Want a figure first? Try our guide price tool, then book a free visit to firm it up.

CallGuide price